MRP II: Difference between revisions
TomAlender (talk | contribs) No edit summary |
TomAlender (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
'''MRP II''' means Manufacturing Resource Planning. The basic idea of the inventor of MRP II, Oliver Wight, is a holistic market and resource-oriented planning of sales, production and inventory quantities (Wight 1995, p. 56) | '''MRP II''' means Manufacturing Resource Planning. The basic idea of the inventor of MRP II, Oliver Wight, is a holistic market and resource-oriented planning of sales, production and inventory quantities (Wight 1995, p. 56) | ||
==History== | |||
Manufacturing Resource Planning (MRP II) is an extension of MRP, which only covers Material Requirements Planning (MRP) (Wight 1995, p. 56). | Manufacturing Resource Planning (MRP II) is an extension of MRP, which only covers Material Requirements Planning (MRP) (Wight 1995, p. 56). | ||
==Goals== | |||
The goals of MRP II are the minimization of storage times, idle times and set-up times as well as the maximization of the capacity utilization of resources (especially machines and manpower). MRP II aims to achieve end-to-end planning - from the business plan to the sales plan to the production plan (Wight 1995, p. 143). | The goals of MRP II are the minimization of storage times, idle times and set-up times as well as the maximization of the capacity utilization of resources (especially machines and manpower). MRP II aims to achieve end-to-end planning - from the business plan to the sales plan to the production plan (Wight 1995, p. 143). | ||
==Requirements for MRP II== | |||
MRP II assumes that essential planning parameters such as capacities, order throughput times and processing times can be predicted with a high degree of certainty. Production bottlenecks must always be overcome by capacity adjustments. Above all, however, it must be possible to predict the production program with sufficient accuracy, which in turn requires a reliable sales forecast or planning. Ideally, these requirements are most likely to be met in mass or large-scale production (Kurbel 2016, p. 133). | MRP II assumes that essential planning parameters such as capacities, order throughput times and processing times can be predicted with a high degree of certainty. Production bottlenecks must always be overcome by capacity adjustments. Above all, however, it must be possible to predict the production program with sufficient accuracy, which in turn requires a reliable sales forecast or planning. Ideally, these requirements are most likely to be met in mass or large-scale production (Kurbel 2016, p. 133). | ||
Revision as of 20:48, 20 November 2020
MRP II means Manufacturing Resource Planning. The basic idea of the inventor of MRP II, Oliver Wight, is a holistic market and resource-oriented planning of sales, production and inventory quantities (Wight 1995, p. 56)
History
Manufacturing Resource Planning (MRP II) is an extension of MRP, which only covers Material Requirements Planning (MRP) (Wight 1995, p. 56).
Goals
The goals of MRP II are the minimization of storage times, idle times and set-up times as well as the maximization of the capacity utilization of resources (especially machines and manpower). MRP II aims to achieve end-to-end planning - from the business plan to the sales plan to the production plan (Wight 1995, p. 143).
Requirements for MRP II
MRP II assumes that essential planning parameters such as capacities, order throughput times and processing times can be predicted with a high degree of certainty. Production bottlenecks must always be overcome by capacity adjustments. Above all, however, it must be possible to predict the production program with sufficient accuracy, which in turn requires a reliable sales forecast or planning. Ideally, these requirements are most likely to be met in mass or large-scale production (Kurbel 2016, p. 133).
References
Author: Tom Alende