Control plan as defined in ISO/TS 16949, it is a documented description of the systems and processes required for product inspection. In the practice of the automotive industry, it is the basic document used to plan product and process related inspections to ensure quality for customers and protect the company against complaints [1].

Main elements

The main elements of the control plan are:

  • operation/process to which the control relates,
  • controlled characteristics of the product or process admission criteria,
  • test plan: sample size and frequency of inspections,
  • the measuring instrument used for inspection,
  • reference to the detailed checklist (if necessary),
  • Controlling person (unless it is an automatic control),
  • reaction plan, i.e. actions to be carried out in case the acceptance criteria are not met [2].

The control function consists in comparing the course or results of activities, i.e. the state achieved with the planned objective, i.e. with the assumed state.

Function

Depending on the adopted criterion of division, we may deal with different types of controls. The basic criterion is the period covered by the control. According to this criterion, we distinguish between them:

  • preliminary control - it is preventive in nature and its purpose is to prevent future potential deviations from the assumptions made,
  • day-to-day control - it is carried out in parallel with the operations being monitored,
  • ad-hoc check - it is carried out when necessary, so it is interventional and to a large extent surprises the inspected persons,
  • final control - this is the basic, most frequent type of control. It consists in comparing the final results of a given action with previously adopted standards [3] .

There are also other criteria for apportionment. For example, according to the criterion of the control entity (who controls it), internal and external control are distinguished. According to the criterion of the scope of control (which part of the activity or effects is controlled), general or piecemeal controls can be distinguished. Finally, according to the criterion of the form of control (how control is carried out), institutionalised and formalised or non-institutionalised and informal controls can be distinguished.

Effective control

For control to be effective, it must be neither late nor too frequent, unplanned, chaotic, bureaucratic, formalistic and, at the same time, irresponsible control of the company's equipment and its operation, as this can lead to evil. It must be established who has the right to carry out checks, within what limits and at what time, and finally, what qualifications the persons carrying out these checks must have. Improper controls create chaos at work, absorb the time of senior managers, inhibit work, and sometimes it may happen that some institutions have too much work [4] .

Elements of the control plan==The control plan consists of the following points===Objectives and typees of control=

The control of an agricultural enterprise and its components has quite different objectives to meet. One of them is proper control, the other is to provide the crew with additional motivation to work effectively [5]. Proper control of the company consists in the evaluation of its condition, working conditions, as well as social and living conditions of the staff.

The assessment of the company's condition consists in the assessment of the quantity and quality of fixed and current assets [6]. On the other hand, the assessment of production activity consists in determining the level of production and their dynamics. finally, the last group of issues subject to control are working and living conditions of the crew. The inspection should show the extent to which health and safety regulations are observed and the conditions in which the employees live [7].

The control of work and the results obtained by the crew as a kind of motivation lies in the fact that every person works better when they know that their work is needed. It is well known how depressing it is to work with the constant carrying of sand by prisoners. The crew, when controlled, works more willingly, efficiently and efficiently; nobody contributes to work that they believe is unnecessary [8]. A distinction is made between three types of control: control in the form of permanent supervision, control during the year and control after the end of the marketing year.

  • Continuous monitoring of the company's activities and the work of the staff shall be carried out within the company by the immediate superiors and of the company as a whole by a senior management level.
  • Different types of institutions are authorised to carry out checks during the year and to which a number of sectional tasks are entrusted. These are institutions dealing with sanitary, fire protection, occupational health and safety issues.
  • The annual control after the end of the marketing year and after the drawing up of the closure balance sheet and the profit and loss account is always carried out by the superior unit in the hierarchy of the management - unification or an equivalent unit [9].

Control areas

Control in organisations can focus on any of its areas: concentration on resources and at a certain level [10].

  • Concentration on resources (financial, physical, human and informational). The management process requires the efficient and effective pooling of these resources to produce appropriate results. Control of physical resources includes stock management, quality control and equipment control. Control of human resources includes day and staffing activities, training and development of managers, evaluation of results and level of remuneration. Control of information resources includes sales and marketing forecasting, environmental analysis, production scheduling and economic forecasting.
  • Level. Operational activity control focusing on one or more operating systems. One type of operation control is quality control. Organisational control deals with the overall functioning of the organisation. Strategic control attempts to determine the extent to which an effective organisation understands its environment and adapts to it [11].

Subjects of control

The subjects of control result from the tasks of proper control. The production and service activity of agricultural enterprises has two sides: substantive activity and financial activity. The scope of substantive activities of enterprises includes branches and activities of agrotechnical, zootechnical, agricultural processing, technical, service and other minor activities [12].

Financial activity is divided into investment and operational activity, i.e. production activity. In terms of investment activity, it is a matter of checking the schedule of works and the difference between the cost estimate and the costs incurred, and finally the assessment of the quality of workmanship. In terms of production activity, it is mainly about the difference between the income and expenses in the economic and financial plan and its execution. It is also, of course, about the quality of the production obtained. Finally, the annual closure is checked for the correctness of its preparation [13].

As far as the control of working and living conditions of the company's staff is concerned, the subjects of the control are based on the objectives set. The equipment required for health and safety at work, all fire safety measures, including the condition of tools and materials, are inspected [14].

Examples of Control plan

  • Control plans typically involve the following elements:
  • Specification of all product characteristics that need to be monitored
  • Identification of the measurement system and techniques used to monitor product characteristics
  • Specification of the acceptable product acceptance limits
  • Identification of the inspection methods and frequency
  • Identification of the responsibilities of personnel involved in the inspections
  • Definition of corrective actions to be taken in the event of a defect
  • Identification of the tools and equipment necessary to conduct the inspections
  • Documentation of the product records and traceability of the parts.

Advantages of Control plan

A Control Plan as defined in ISO/TS 16949 is a documented description of the systems and processes required for product inspection. It provides numerous advantages for companies in the automotive industry, including:

  • Improved product quality - By developing a Control Plan, companies can identify potential quality issues before they occur, ensuring that the products meet customer requirements.
  • Reduced costs - By identifying areas of risk, companies can reduce the cost of rework and scrap. Control Plans provide a structured approach to inspecting processes and products, allowing companies to quickly identify areas of non-conformance.
  • Improved customer satisfaction - By developing a Control Plan, companies can provide their customers with consistent, high-quality products that meet their requirements. This leads to higher customer satisfaction and loyalty.
  • Increased efficiency - Control Plans allow companies to monitor processes and products throughout the production process. This helps to ensure that processes are running efficiently and that products meet customer requirements.
  • Improved process control - Control Plans provide a framework for monitoring and controlling processes, which helps to reduce the risk of errors and defects. This leads to improved product quality and greater customer satisfaction.

Limitations of Control plan

Control plans have certain limitations that must be taken into account when implementing them. These include:

  • They can be overly complex and cumbersome, making them difficult to implement in certain circumstances.
  • They are often costly to implement due to the need for additional personnel, resources, and infrastructure.
  • They require a significant amount of training and education to ensure that personnel understand and obey the plan.
  • If a plan is not followed correctly, it can lead to quality issues that could have been avoided.
  • They are not always easy to monitor or measure for effectiveness.
  • If a problem does arise, it can sometimes be difficult to identify the root cause.
  • They can be time-consuming to update and maintain.

Other approaches related to Control plan

Introduction: In addition to the ISO/TS 16949 Control plan, there are other approaches used to ensure product inspection and quality.

  • Statistical Process Control (SPC) is a process that involves using statistical techniques to monitor and control a process. It uses statistical data to detect process variation and helps to identify sources of variation in the process.
  • Process Mapping is a technique used to capture and document the steps and activities in a process. It is used to identify process variations, inefficiencies, and opportunities for improvement.
  • Process Failure Mode and Effects Analysis (PFMEA) is a technique used to identify potential process failure modes, their causes, and their effects. It is used to identify potential risks and to develop plans to prevent or mitigate the risks.
  • Process Control Plans (PCPs) are used to document the process control requirements and to define the inspection and testing that is required to ensure that the process produces a quality product.
  • Design of Experiments (DOE) is a technique used to identify the factors that affect the process and to determine the ideal process settings and conditions.

Summary: In addition to the ISO/TS 16949 Control plan, there are other approaches such as Statistical Process Control (SPC), Process Mapping, Process Failure Mode and Effects Analysis (PFMEA), Process Control Plans (PCPs), and Design of Experiments (DOE) that can be used to ensure product inspection and quality.


Control planrecommended articles
ControllingTypes of control systemHACCP systemZero defectsQuality inspectionQuality control planQuality loss functionOperational controllingEarly warning system

References

Footnotes

  1. J. Seddon 2003,p.4586
  2. J. Seddon 2003,p.4586
  3. S. Nokes 2003, pp. 4586
  4. B.D. Clinton 2006, p.45
  5. SEC Interpretive Guidance. Securities and Exchange Commission. June 20, 2007.
  6. American Institute of Certified Public Accountants, 2002
  7. J. Seddon, 2003, p.45
  8. S. Nokes, 2000, p.17
  9. S. Nokes, 2000, p.19
  10. B.D. Clinton, A. Van der Merwe 2006, p. 34-35
  11. B.D. Clinton, A. Van der Merwe 2006, p. 34-35
  12. American Institute of Certified Public Accountants (2002)
  13. J. Seddon, 2003, p.48
  14. American Institute of Certified Public Accountants (2002)

Author: Patrycja Barszcz