https://ceopedia.org/index.php?title=Determining_the_length_of_the_production_cycle&feed=atom&action=historyDetermining the length of the production cycle - Revision history2024-03-29T01:04:40ZRevision history for this page on the wikiMediaWiki 1.39.4https://ceopedia.org/index.php?title=Determining_the_length_of_the_production_cycle&diff=91452&oldid=prevSw: Text cleaning2023-11-17T19:05:03Z<p>Text cleaning</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 20:05, 17 November 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l5">Line 5:</td>
<td colspan="2" class="diff-lineno">Line 5:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Knowledge]] of the length of the production cycle is a very important economic aspect in the [[production management]]. Production requires material resources, employees and equipment from the beginning to the end of its duration. By this, significant financial costs are incurred while financial results (income) appear after some time. For this reason, each [[enterprise]] is committed to reduction of the length of the production cycle, which also reduces costs of production and gives more opportunity to sell products faster.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Knowledge]] of the length of the production cycle is a very important economic aspect in the [[production management]]. Production requires material resources, employees and equipment from the beginning to the end of its duration. By this, significant financial costs are incurred while financial results (income) appear after some time. For this reason, each [[enterprise]] is committed to reduction of the length of the production cycle, which also reduces costs of production and gives more opportunity to sell products faster.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>==Examples of <del style="font-weight: bold; text-decoration: none;"> </del>the length of the production cycle==</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>==Examples of the length of the production cycle==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For a high-volume production of simple parts such as screws and nuts, the production cycle can be as short as a few minutes. It includes the processes of stamping, plating and packaging, which can be automated and completed in a matter of minutes.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For a high-volume production of simple parts such as screws and nuts, the production cycle can be as short as a few minutes. It includes the processes of stamping, plating and packaging, which can be automated and completed in a matter of minutes.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For complex products such as cars and aircraft, the production cycle is much longer, as it involves a wide range of processes such as design, manufacturing, assembly, testing and delivery. This process could take months or even years to complete.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For complex products such as cars and aircraft, the production cycle is much longer, as it involves a wide range of processes such as design, manufacturing, assembly, testing and delivery. This process could take months or even years to complete.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l27">Line 27:</td>
<td colspan="2" class="diff-lineno">Line 27:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Other approaches related to the length of the production cycle==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Other approaches related to the length of the production cycle==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>One possible approach to determining the length of the production cycle is to consider the following elements:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>One possible approach to determining the length of the production cycle is to consider the following elements:</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Specifications of the product <del style="font-weight: bold; text-decoration: none;">– </del>the complexity of the product and its components, as well as the number of stages in production, will determine the amount of time it takes to complete the cycle.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Specifications of the product <ins style="font-weight: bold; text-decoration: none;">- </ins>the complexity of the product and its components, as well as the number of stages in production, will determine the amount of time it takes to complete the cycle.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Technological sophistication <del style="font-weight: bold; text-decoration: none;">– </del>the more advanced the [[technology]] employed in production, the more efficient the process and the shorter the production cycle.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Technological sophistication <ins style="font-weight: bold; text-decoration: none;">- </ins>the more advanced the [[technology]] employed in production, the more efficient the process and the shorter the production cycle.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Organization of the production process <del style="font-weight: bold; text-decoration: none;">– </del>a cohesive, well-structured [[plan]] will reduce the time taken to complete the production cycle.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Organization of the production process <ins style="font-weight: bold; text-decoration: none;">- </ins>a cohesive, well-structured [[plan]] will reduce the time taken to complete the production cycle.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Qualifications of the employees <del style="font-weight: bold; text-decoration: none;">– </del>experienced, highly-skilled employees can operate machinery more efficiently and effectively, leading to a shorter production cycle.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Qualifications of the employees <ins style="font-weight: bold; text-decoration: none;">- </ins>experienced, highly-skilled employees can operate machinery more efficiently and effectively, leading to a shorter production cycle.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Available resources <del style="font-weight: bold; text-decoration: none;">– </del>the availability of certain materials or machines can significantly reduce the length of the production cycle.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Available resources <ins style="font-weight: bold; text-decoration: none;">- </ins>the availability of certain materials or machines can significantly reduce the length of the production cycle.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In conclusion, the length of a production cycle is determined by the product specifications, technological sophistication, organization of the production process, qualifications of the employees and available resources.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In conclusion, the length of a production cycle is determined by the product specifications, technological sophistication, organization of the production process, qualifications of the employees and available resources.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l41">Line 41:</td>
<td colspan="2" class="diff-lineno">Line 41:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Rahim, M. A., & Lashkari, R. S. (1985). ''Optimal decision rules for determining the length of the production run''. Computers & industrial engineering, 9(2), 195-202.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Rahim, M. A., & Lashkari, R. S. (1985). ''Optimal decision rules for determining the length of the production run''. Computers & industrial engineering, 9(2), 195-202.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Rahim, M. A., & Raouf, A. (1988). ''Optimal production run for a process having multilevel tool wear''. International journal of systems science, 19(1), 139-149.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Rahim, M. A., & Raouf, A. (1988). ''Optimal production run for a process having multilevel tool wear''. International journal of systems science, 19(1), 139-149.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Category:Production management]]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Category:Production management]]</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[pl:Określanie długości cyklu produkcyjnego]]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[pl:Określanie długości cyklu produkcyjnego]]</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Determining_the_length_of_the_production_cycle&diff=90024&oldid=prevSw: Infobox5 upgrade2023-11-17T16:50:09Z<p>Infobox5 upgrade</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 17:50, 17 November 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l1">Line 1:</td>
<td colspan="2" class="diff-lineno">Line 1:</td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">{{infobox4</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">|list1=</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><ul></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Designed quality]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Line balancing]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Production reserve]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Optimization of the production run-length]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Continuous process]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Master production schedule]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Cycle time]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Non recurring cost]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Tooling costs]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></ul></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">}}</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>'''Determining the length of the [[production cycle]]''' (i.e. period from the start of the [[production]] [[process]] to its completion) involves [[identification]] of particular [[product]] material and process requirements. Production cycle depends on such factors as: specification of the product, technological sophistication, [[organization]] of the [[production process]], qualifications of the employees and available resources.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>'''Determining the length of the [[production cycle]]''' (i.e. period from the start of the [[production]] [[process]] to its completion) involves [[identification]] of particular [[product]] material and process requirements. Production cycle depends on such factors as: specification of the product, technological sophistication, [[organization]] of the [[production process]], qualifications of the employees and available resources.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l50">Line 50:</td>
<td colspan="2" class="diff-lineno">Line 34:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In conclusion, the length of a production cycle is determined by the product specifications, technological sophistication, organization of the production process, qualifications of the employees and available resources.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In conclusion, the length of a production cycle is determined by the product specifications, technological sophistication, organization of the production process, qualifications of the employees and available resources.</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">{{infobox5|list1={{i5link|a=[[Designed quality]]}} &mdash; {{i5link|a=[[Line balancing]]}} &mdash; {{i5link|a=[[Production reserve]]}} &mdash; {{i5link|a=[[Optimization of the production run-length]]}} &mdash; {{i5link|a=[[Continuous process]]}} &mdash; {{i5link|a=[[Master production schedule]]}} &mdash; {{i5link|a=[[Cycle time]]}} &mdash; {{i5link|a=[[Non recurring cost]]}} &mdash; {{i5link|a=[[Tooling costs]]}} }}</ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Determining_the_length_of_the_production_cycle&diff=81922&oldid=prevSw: Infobox update2023-03-19T19:49:47Z<p>Infobox update</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 20:49, 19 March 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l2">Line 2:</td>
<td colspan="2" class="diff-lineno">Line 2:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|list1=</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|list1=</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><ul></div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><ul></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><li>[[<del style="font-weight: bold; text-decoration: none;">Cost avoidance</del>]]</li></div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><li>[[<ins style="font-weight: bold; text-decoration: none;">Designed quality]]</li></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"><li>[[Line balancing]]</li></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"><li>[[Production reserve]]</li></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"><li>[[Optimization of the production run-length]]</li></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"><li>[[Continuous process]]</li></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"><li>[[Master production schedule]]</li></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"><li>[[Cycle time]]</li></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"><li>[[Non recurring cost</ins>]]</li></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><li>[[Tooling costs]]</li></div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><li>[[Tooling costs]]</li></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Cost of production]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Spaghetti diagram]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Dependent demand]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Purchasing in the case of discontinuities in needs]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Costs of production]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Capital resource]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Non recurring cost]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div></ul></div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div></ul></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>}}</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>}}</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>'''Determining the length of the [[production cycle]]''' (i.e. period from the start of the [[production]] [[process]] to its completion) involves [[identification]] of particular [[product]] material and process requirements. Production cycle depends on such factors as: specification of the product, technological sophistication, [[organization]] of the [[production process]], qualifications of the employees and available resources.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>'''Determining the length of the [[production cycle]]''' (i.e. period from the start of the [[production]] [[process]] to its completion) involves [[identification]] of particular [[product]] material and process requirements. Production cycle depends on such factors as: specification of the product, technological sophistication, [[organization]] of the [[production process]], qualifications of the employees and available resources.</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Determining_the_length_of_the_production_cycle&diff=72603&oldid=prevSw at 17:14, 7 February 20232023-02-07T17:14:52Z<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 18:14, 7 February 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l14">Line 14:</td>
<td colspan="2" class="diff-lineno">Line 14:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>}}</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>}}</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>Determining the length of the [[production cycle]] (i.e. period from the start of the [[production]] [[process]] to its completion) involves [[identification]] of particular [[product]] material and process requirements. Production cycle depends on such factors as: specification of the product, technological sophistication, [[organization]] of the [[production process]], qualifications of the employees and available resources.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">'''</ins>Determining the length of the [[production cycle]]<ins style="font-weight: bold; text-decoration: none;">''' </ins>(i.e. period from the start of the [[production]] [[process]] to its completion) involves [[identification]] of particular [[product]] material and process requirements. Production cycle depends on such factors as: specification of the product, technological sophistication, [[organization]] of the [[production process]], qualifications of the employees and available resources.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Calculation of the length of the production cycle is important in the [[planning]] of the production, supply and waste disposal processes. For this purpose managers can use methods that have varied character (i.e. analytical, graphics and mixed). Duration of the operations of the production process and time gaps in the basic production process can be determined using statistical analysis, experimental design, estimation methods. The most common methods are: estimation and statistical-empirical [[method]]. These methods are not very accurate, and sometimes cannot be applied, in particular in case of new products or new equipment. In such case managers could apply analytical or heuristic methods.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Calculation of the length of the production cycle is important in the [[planning]] of the production, supply and waste disposal processes. For this purpose managers can use methods that have varied character (i.e. analytical, graphics and mixed). Duration of the operations of the production process and time gaps in the basic production process can be determined using statistical analysis, experimental design, estimation methods. The most common methods are: estimation and statistical-empirical [[method]]. These methods are not very accurate, and sometimes cannot be applied, in particular in case of new products or new equipment. In such case managers could apply analytical or heuristic methods.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l20">Line 20:</td>
<td colspan="2" class="diff-lineno">Line 20:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Knowledge]] of the length of the production cycle is a very important economic aspect in the [[production management]]. Production requires material resources, employees and equipment from the beginning to the end of its duration. By this, significant financial costs are incurred while financial results (income) appear after some time. For this reason, each [[enterprise]] is committed to reduction of the length of the production cycle, which also reduces costs of production and gives more opportunity to sell products faster.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Knowledge]] of the length of the production cycle is a very important economic aspect in the [[production management]]. Production requires material resources, employees and equipment from the beginning to the end of its duration. By this, significant financial costs are incurred while financial results (income) appear after some time. For this reason, each [[enterprise]] is committed to reduction of the length of the production cycle, which also reduces costs of production and gives more opportunity to sell products faster.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">'''See also:'''</del></div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>==Examples of <ins style="font-weight: bold; text-decoration: none;"> </ins>the length of the production cycle==</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">* [[Optimization of the production run-length]]</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div> </div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>==Examples of <del style="font-weight: bold; text-decoration: none;">Determining </del>the length of the production cycle==</div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For a high-volume production of simple parts such as screws and nuts, the production cycle can be as short as a few minutes. It includes the processes of stamping, plating and packaging, which can be automated and completed in a matter of minutes.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For a high-volume production of simple parts such as screws and nuts, the production cycle can be as short as a few minutes. It includes the processes of stamping, plating and packaging, which can be automated and completed in a matter of minutes.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For complex products such as cars and aircraft, the production cycle is much longer, as it involves a wide range of processes such as design, manufacturing, assembly, testing and delivery. This process could take months or even years to complete.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For complex products such as cars and aircraft, the production cycle is much longer, as it involves a wide range of processes such as design, manufacturing, assembly, testing and delivery. This process could take months or even years to complete.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For sophisticated products such as medical devices and electronics, the production cycle can be even longer. It includes processes such as [[research and development]], prototyping, production, [[quality]] assurance and regulatory approvals. This process could take several years to complete.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For sophisticated products such as medical devices and electronics, the production cycle can be even longer. It includes processes such as [[research and development]], prototyping, production, [[quality]] assurance and regulatory approvals. This process could take several years to complete.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>==Advantages of <del style="font-weight: bold; text-decoration: none;">Determining </del>the length of the production cycle==</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>==Advantages of <ins style="font-weight: bold; text-decoration: none;">determining </ins>the length of the production cycle==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Determining the length of the production cycle can be beneficial in many ways. These advantages include:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Determining the length of the production cycle can be beneficial in many ways. These advantages include:</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Improved [[efficiency]] - Knowing the length of the production cycle can help to identify any inefficiencies in the process and develop strategies to reduce them. This can lead to a more streamlined production process, resulting in [[cost]] savings.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Improved [[efficiency]] - Knowing the length of the production cycle can help to identify any inefficiencies in the process and develop strategies to reduce them. This can lead to a more streamlined production process, resulting in [[cost]] savings.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l35">Line 35:</td>
<td colspan="2" class="diff-lineno">Line 32:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Reduced lead times - Understanding the production cycle can help to reduce lead times and increase [[customer]] satisfaction. This can also reduce cost and time to market, which can be advantageous for businesses.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Reduced lead times - Understanding the production cycle can help to reduce lead times and increase [[customer]] satisfaction. This can also reduce cost and time to market, which can be advantageous for businesses.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>==Limitations of <del style="font-weight: bold; text-decoration: none;">Determining </del>the length of the production cycle==</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>==Limitations of <ins style="font-weight: bold; text-decoration: none;">determining </ins>the length of the production cycle==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The length of the production cycle can be determined by various factors, such as the specification of the product, technological sophistication, organization of the production process, qualifications of the employees and available resources. However, there are certain limitations to accurately determine the length of this cycle: </div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The length of the production cycle can be determined by various factors, such as the specification of the product, technological sophistication, organization of the production process, qualifications of the employees and available resources. However, there are certain limitations to accurately determine the length of this cycle: </div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The complexity and scope of the product can significantly affect the production cycle, and it may be difficult to accurately predict how long it will take to produce.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The complexity and scope of the product can significantly affect the production cycle, and it may be difficult to accurately predict how long it will take to produce.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l43">Line 43:</td>
<td colspan="2" class="diff-lineno">Line 40:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The qualifications of the employees involved in the production cycle can also limit its length. If the employees are not qualified or experienced enough, the production cycle may take longer.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The qualifications of the employees involved in the production cycle can also limit its length. If the employees are not qualified or experienced enough, the production cycle may take longer.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>==Other approaches related to <del style="font-weight: bold; text-decoration: none;">Determining </del>the length of the production cycle==</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>==Other approaches related to the length of the production cycle==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>One possible approach to determining the length of the production cycle is to consider the following elements:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>One possible approach to determining the length of the production cycle is to consider the following elements:</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Specifications of the product – the complexity of the product and its components, as well as the number of stages in production, will determine the amount of time it takes to complete the cycle.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Specifications of the product – the complexity of the product and its components, as well as the number of stages in production, will determine the amount of time it takes to complete the cycle.</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Determining_the_length_of_the_production_cycle&diff=72242&oldid=prev127.0.0.1: The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).2023-02-05T12:42:58Z<p>The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 13:42, 5 February 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l26">Line 26:</td>
<td colspan="2" class="diff-lineno">Line 26:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For a high-volume production of simple parts such as screws and nuts, the production cycle can be as short as a few minutes. It includes the processes of stamping, plating and packaging, which can be automated and completed in a matter of minutes.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For a high-volume production of simple parts such as screws and nuts, the production cycle can be as short as a few minutes. It includes the processes of stamping, plating and packaging, which can be automated and completed in a matter of minutes.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For complex products such as cars and aircraft, the production cycle is much longer, as it involves a wide range of processes such as design, manufacturing, assembly, testing and delivery. This process could take months or even years to complete.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* For complex products such as cars and aircraft, the production cycle is much longer, as it involves a wide range of processes such as design, manufacturing, assembly, testing and delivery. This process could take months or even years to complete.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* For sophisticated products such as medical devices and electronics, the production cycle can be even longer. It includes processes such as research and development, prototyping, production, quality assurance and regulatory approvals. This process could take several years to complete.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* For sophisticated products such as medical devices and electronics, the production cycle can be even longer. It includes processes such as <ins style="font-weight: bold; text-decoration: none;">[[</ins>research and development<ins style="font-weight: bold; text-decoration: none;">]]</ins>, prototyping, production, <ins style="font-weight: bold; text-decoration: none;">[[</ins>quality<ins style="font-weight: bold; text-decoration: none;">]] </ins>assurance and regulatory approvals. This process could take several years to complete.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Advantages of Determining the length of the production cycle==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Advantages of Determining the length of the production cycle==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Determining the length of the production cycle can be beneficial in many ways. These advantages include:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Determining the length of the production cycle can be beneficial in many ways. These advantages include:</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Improved efficiency - Knowing the length of the production cycle can help to identify any inefficiencies in the process and develop strategies to reduce them. This can lead to a more streamlined production process, resulting in cost savings.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Improved <ins style="font-weight: bold; text-decoration: none;">[[</ins>efficiency<ins style="font-weight: bold; text-decoration: none;">]] </ins>- Knowing the length of the production cycle can help to identify any inefficiencies in the process and develop strategies to reduce them. This can lead to a more streamlined production process, resulting in <ins style="font-weight: bold; text-decoration: none;">[[</ins>cost<ins style="font-weight: bold; text-decoration: none;">]] </ins>savings.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* More accurate forecasts - Having an accurate timeline for the production cycle can enable better forecasting of market demand and help to ensure that there is enough capacity to meet demand.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* More accurate forecasts - Having an accurate timeline for the production cycle can enable better <ins style="font-weight: bold; text-decoration: none;">[[</ins>forecasting<ins style="font-weight: bold; text-decoration: none;">]] </ins>of <ins style="font-weight: bold; text-decoration: none;">[[</ins>market<ins style="font-weight: bold; text-decoration: none;">]] [[</ins>demand<ins style="font-weight: bold; text-decoration: none;">]] </ins>and help to ensure that there is enough capacity to meet demand.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Improved quality control - Knowing the length of the production cycle allows for better planning of quality control processes. This can help to reduce defects and ensure the product meets quality standards.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Improved <ins style="font-weight: bold; text-decoration: none;">[[</ins>quality control<ins style="font-weight: bold; text-decoration: none;">]] </ins>- Knowing the length of the production cycle allows for better planning of quality control processes. This can help to reduce defects and ensure the product meets quality standards.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Reduced lead times - Understanding the production cycle can help to reduce lead times and increase customer satisfaction. This can also reduce cost and time to market, which can be advantageous for businesses.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Reduced lead times - Understanding the production cycle can help to reduce lead times and increase <ins style="font-weight: bold; text-decoration: none;">[[</ins>customer<ins style="font-weight: bold; text-decoration: none;">]] </ins>satisfaction. This can also reduce cost and time to market, which can be advantageous for businesses.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Limitations of Determining the length of the production cycle==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Limitations of Determining the length of the production cycle==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The length of the production cycle can be determined by various factors, such as the specification of the product, technological sophistication, organization of the production process, qualifications of the employees and available resources. However, there are certain limitations to accurately determine the length of this cycle: </div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The length of the production cycle can be determined by various factors, such as the specification of the product, technological sophistication, organization of the production process, qualifications of the employees and available resources. However, there are certain limitations to accurately determine the length of this cycle: </div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The complexity and scope of the product can significantly affect the production cycle, and it may be difficult to accurately predict how long it will take to produce.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The complexity and scope of the product can significantly affect the production cycle, and it may be difficult to accurately predict how long it will take to produce.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* The availability of resources, including materials, machinery, and labor, can also limit the length of the production cycle. If resources are scarce, the production cycle may be longer than expected.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* The <ins style="font-weight: bold; text-decoration: none;">[[</ins>availability of resources<ins style="font-weight: bold; text-decoration: none;">]]</ins>, including materials, machinery, and labor, can also limit the length of the production cycle. If resources are scarce, the production cycle may be longer than expected.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Unforeseen events, such as an unexpected problem with machinery or an unexpected delay in the delivery of materials, can also limit the length of the production cycle.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Unforeseen events, such as an unexpected problem with machinery or an unexpected delay in the delivery of materials, can also limit the length of the production cycle.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The complexity of the production process can also limit the length of the production cycle. If the process is complicated, it may take longer to complete. </div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The complexity of the production process can also limit the length of the production cycle. If the process is complicated, it may take longer to complete. </div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l46">Line 46:</td>
<td colspan="2" class="diff-lineno">Line 46:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>One possible approach to determining the length of the production cycle is to consider the following elements:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>One possible approach to determining the length of the production cycle is to consider the following elements:</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Specifications of the product – the complexity of the product and its components, as well as the number of stages in production, will determine the amount of time it takes to complete the cycle.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Specifications of the product – the complexity of the product and its components, as well as the number of stages in production, will determine the amount of time it takes to complete the cycle.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Technological sophistication – the more advanced the technology employed in production, the more efficient the process and the shorter the production cycle.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Technological sophistication – the more advanced the <ins style="font-weight: bold; text-decoration: none;">[[</ins>technology<ins style="font-weight: bold; text-decoration: none;">]] </ins>employed in production, the more efficient the process and the shorter the production cycle.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Organization of the production process – a cohesive, well-structured plan will reduce the time taken to complete the production cycle.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Organization of the production process – a cohesive, well-structured <ins style="font-weight: bold; text-decoration: none;">[[</ins>plan<ins style="font-weight: bold; text-decoration: none;">]] </ins>will reduce the time taken to complete the production cycle.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Qualifications of the employees – experienced, highly-skilled employees can operate machinery more efficiently and effectively, leading to a shorter production cycle.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Qualifications of the employees – experienced, highly-skilled employees can operate machinery more efficiently and effectively, leading to a shorter production cycle.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Available resources – the availability of certain materials or machines can significantly reduce the length of the production cycle.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Available resources – the availability of certain materials or machines can significantly reduce the length of the production cycle.</div></td></tr>
</table>127.0.0.1https://ceopedia.org/index.php?title=Determining_the_length_of_the_production_cycle&diff=72241&oldid=prevSw: Article improvement2023-02-05T12:42:39Z<p>Article improvement</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 13:42, 5 February 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l22">Line 22:</td>
<td colspan="2" class="diff-lineno">Line 22:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>'''See also:'''</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>'''See also:'''</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* [[Optimization of the production run-length]]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* [[Optimization of the production run-length]]</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">==Examples of Determining the length of the production cycle==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* For a high-volume production of simple parts such as screws and nuts, the production cycle can be as short as a few minutes. It includes the processes of stamping, plating and packaging, which can be automated and completed in a matter of minutes.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* For complex products such as cars and aircraft, the production cycle is much longer, as it involves a wide range of processes such as design, manufacturing, assembly, testing and delivery. This process could take months or even years to complete.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* For sophisticated products such as medical devices and electronics, the production cycle can be even longer. It includes processes such as research and development, prototyping, production, quality assurance and regulatory approvals. This process could take several years to complete.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">==Advantages of Determining the length of the production cycle==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">Determining the length of the production cycle can be beneficial in many ways. These advantages include:</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Improved efficiency - Knowing the length of the production cycle can help to identify any inefficiencies in the process and develop strategies to reduce them. This can lead to a more streamlined production process, resulting in cost savings.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* More accurate forecasts - Having an accurate timeline for the production cycle can enable better forecasting of market demand and help to ensure that there is enough capacity to meet demand.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Improved quality control - Knowing the length of the production cycle allows for better planning of quality control processes. This can help to reduce defects and ensure the product meets quality standards.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Reduced lead times - Understanding the production cycle can help to reduce lead times and increase customer satisfaction. This can also reduce cost and time to market, which can be advantageous for businesses.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">==Limitations of Determining the length of the production cycle==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">The length of the production cycle can be determined by various factors, such as the specification of the product, technological sophistication, organization of the production process, qualifications of the employees and available resources. However, there are certain limitations to accurately determine the length of this cycle: </ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* The complexity and scope of the product can significantly affect the production cycle, and it may be difficult to accurately predict how long it will take to produce.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* The availability of resources, including materials, machinery, and labor, can also limit the length of the production cycle. If resources are scarce, the production cycle may be longer than expected.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Unforeseen events, such as an unexpected problem with machinery or an unexpected delay in the delivery of materials, can also limit the length of the production cycle.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* The complexity of the production process can also limit the length of the production cycle. If the process is complicated, it may take longer to complete. </ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* The qualifications of the employees involved in the production cycle can also limit its length. If the employees are not qualified or experienced enough, the production cycle may take longer.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">==Other approaches related to Determining the length of the production cycle==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">One possible approach to determining the length of the production cycle is to consider the following elements:</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Specifications of the product – the complexity of the product and its components, as well as the number of stages in production, will determine the amount of time it takes to complete the cycle.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Technological sophistication – the more advanced the technology employed in production, the more efficient the process and the shorter the production cycle.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Organization of the production process – a cohesive, well-structured plan will reduce the time taken to complete the production cycle.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Qualifications of the employees – experienced, highly-skilled employees can operate machinery more efficiently and effectively, leading to a shorter production cycle.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Available resources – the availability of certain materials or machines can significantly reduce the length of the production cycle.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">In conclusion, the length of a production cycle is determined by the product specifications, technological sophistication, organization of the production process, qualifications of the employees and available resources.</ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Determining_the_length_of_the_production_cycle&diff=56857&oldid=prevSw: Infobox update2019-12-01T12:34:18Z<p>Infobox update</p>
<p><b>New page</b></p><div>{{infobox4<br />
|list1=<br />
<ul><br />
<li>[[Cost avoidance]]</li><br />
<li>[[Tooling costs]]</li><br />
<li>[[Cost of production]]</li><br />
<li>[[Spaghetti diagram]]</li><br />
<li>[[Dependent demand]]</li><br />
<li>[[Purchasing in the case of discontinuities in needs]]</li><br />
<li>[[Costs of production]]</li><br />
<li>[[Capital resource]]</li><br />
<li>[[Non recurring cost]]</li><br />
</ul><br />
}}<br />
<br />
Determining the length of the [[production cycle]] (i.e. period from the start of the [[production]] [[process]] to its completion) involves [[identification]] of particular [[product]] material and process requirements. Production cycle depends on such factors as: specification of the product, technological sophistication, [[organization]] of the [[production process]], qualifications of the employees and available resources.<br />
<br />
Calculation of the length of the production cycle is important in the [[planning]] of the production, supply and waste disposal processes. For this purpose managers can use methods that have varied character (i.e. analytical, graphics and mixed). Duration of the operations of the production process and time gaps in the basic production process can be determined using statistical analysis, experimental design, estimation methods. The most common methods are: estimation and statistical-empirical [[method]]. These methods are not very accurate, and sometimes cannot be applied, in particular in case of new products or new equipment. In such case managers could apply analytical or heuristic methods.<br />
<br />
[[Knowledge]] of the length of the production cycle is a very important economic aspect in the [[production management]]. Production requires material resources, employees and equipment from the beginning to the end of its duration. By this, significant financial costs are incurred while financial results (income) appear after some time. For this reason, each [[enterprise]] is committed to reduction of the length of the production cycle, which also reduces costs of production and gives more opportunity to sell products faster.<br />
<br />
'''See also:'''<br />
* [[Optimization of the production run-length]]<br />
<br />
==References==<br />
* Herrmann, J. W., & Chincholkar, M. M. (2000, September). ''[http://www.isr.umd.edu/Labs/CIM/projects/dfp/dfm2000.pdf Design for production: a tool for reducing manufacturing cycle time]''. In Proc. of the 2000 ASME Design Engineering Technical Conference (p. 10-13).<br />
* Rahim, M. A., & Lashkari, R. S. (1985). ''Optimal decision rules for determining the length of the production run''. Computers & industrial engineering, 9(2), 195-202.<br />
* Rahim, M. A., & Raouf, A. (1988). ''Optimal production run for a process having multilevel tool wear''. International journal of systems science, 19(1), 139-149.<br />
<br />
[[Category:Production management]]<br />
[[pl:Określanie długości cyklu produkcyjnego]]</div>Sw