https://ceopedia.org/index.php?title=Production_reserve&feed=atom&action=historyProduction reserve - Revision history2024-03-28T13:43:47ZRevision history for this page on the wikiMediaWiki 1.39.4https://ceopedia.org/index.php?title=Production_reserve&diff=95632&oldid=prevSw: Text cleaning2023-11-18T01:46:48Z<p>Text cleaning</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 02:46, 18 November 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l1">Line 1:</td>
<td colspan="2" class="diff-lineno">Line 1:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Reserve capacity (Rc) is the difference between the size of the calculated capacity (Cc) and achieved the size of [[production]] in the [[enterprise]] (Pr).</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Reserve capacity (Rc) is the difference between the size of the calculated capacity (Cc) and achieved the size of [[production]] in the [[enterprise]] (Pr).</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>Rc = Cc <del style="font-weight: bold; text-decoration: none;">– </del>Pr [unit production]</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>Rc = Cc <ins style="font-weight: bold; text-decoration: none;">- </ins>Pr [unit production]</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The presence of reserves is required because of [[risk]] of economic processes. The size of the reserves must be subject to optimization containing maintenance costs and changing [[market]] [[demand]]. [[Knowledge]] of [[production capacity]] is necessary to determine the increase in production (not requiring additional [[investments]]), and for the determination of improving the [[efficiency]] of [[investment]] processes.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>The presence of reserves is required because of [[risk]] of economic processes. The size of the reserves must be subject to optimization containing maintenance costs and changing [[market]] [[demand]]. [[Knowledge]] of [[production capacity]] is necessary to determine the increase in production (not requiring additional [[investments]]), and for the determination of improving the [[efficiency]] of [[investment]] processes.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l11">Line 11:</td>
<td colspan="2" class="diff-lineno">Line 11:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* elimination of non-productive run of machines</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* elimination of non-productive run of machines</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>==Extensive Reserve ==</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>==Extensive Reserve==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Extensive reserves are connected with idle operation of machinery and equipment</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Extensive reserves are connected with idle operation of machinery and equipment</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Downtime <del style="font-weight: bold; text-decoration: none;">– </del>device idle time due to lack of workers or during refurbishment, * Whole shift downtime - caused by prolonged preparatory time of machinery and equipment.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Downtime <ins style="font-weight: bold; text-decoration: none;">- </ins>device idle time due to lack of workers or during refurbishment, * Whole shift downtime - caused by prolonged preparatory time of machinery and equipment.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Loss - breaks due to lengthy repairs, accidents, lack of materials, and other organizational issues</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Loss - breaks due to lengthy repairs, accidents, lack of materials, and other organizational issues</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Breaks during the [[work]] day - regular break for employees to reduce fatigue. Some downtime due to the fault of the worker: the [[absence]] of work, being late to work, early finishing of work.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Breaks during the [[work]] day - regular break for employees to reduce fatigue. Some downtime due to the fault of the worker: the [[absence]] of work, being late to work, early finishing of work.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l64">Line 64:</td>
<td colspan="2" class="diff-lineno">Line 64:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Kleindorfer, P. R., Singhal, K., & Wassenhove, L. N. (2005). ''[http://www.icesi.edu.co/blogs/semillerosi3/files/2013/12/06-04-PK.pdf Sustainable operations management]''. Production and operations [[management]], 14(4), 482-492.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Kleindorfer, P. R., Singhal, K., & Wassenhove, L. N. (2005). ''[http://www.icesi.edu.co/blogs/semillerosi3/files/2013/12/06-04-PK.pdf Sustainable operations management]''. Production and operations [[management]], 14(4), 482-492.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Category:Production management]]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[Category:Production management]]</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[pl:Rezerwa produkcyjna]]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>[[pl:Rezerwa produkcyjna]]</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Production_reserve&diff=94360&oldid=prevSw: Infobox5 upgrade2023-11-17T23:44:48Z<p>Infobox5 upgrade</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 00:44, 18 November 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l1">Line 1:</td>
<td colspan="2" class="diff-lineno">Line 1:</td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">{{infobox4</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">|list1=</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><ul></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Uniformity of production]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Factor of production]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Optimization of the production run-length]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Determining the length of the production cycle]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Direct labor efficiency variance]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Production capacity]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Hidden cost]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Indirect labor]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Departmental planning]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></ul></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;">}}</del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Reserve capacity (Rc) is the difference between the size of the calculated capacity (Cc) and achieved the size of [[production]] in the [[enterprise]] (Pr).</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Reserve capacity (Rc) is the difference between the size of the calculated capacity (Cc) and achieved the size of [[production]] in the [[enterprise]] (Pr).</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l75">Line 75:</td>
<td colspan="2" class="diff-lineno">Line 59:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Summary:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Summary:</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In addition to reserve capacity, other approaches are used to measure production reserve, such as capacity utilization rate, capacity planning, [[resource utilization]], and contingency planning. Each approach has a different purpose, but all are used to ensure that resources are used efficiently and that risks are properly managed.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In addition to reserve capacity, other approaches are used to measure production reserve, such as capacity utilization rate, capacity planning, [[resource utilization]], and contingency planning. Each approach has a different purpose, but all are used to ensure that resources are used efficiently and that risks are properly managed.</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">{{infobox5|list1={{i5link|a=[[Uniformity of production]]}} &mdash; {{i5link|a=[[Factor of production]]}} &mdash; {{i5link|a=[[Optimization of the production run-length]]}} &mdash; {{i5link|a=[[Determining the length of the production cycle]]}} &mdash; {{i5link|a=[[Direct labor efficiency variance]]}} &mdash; {{i5link|a=[[Production capacity]]}} &mdash; {{i5link|a=[[Hidden cost]]}} &mdash; {{i5link|a=[[Indirect labor]]}} &mdash; {{i5link|a=[[Departmental planning]]}} }}</ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Production_reserve&diff=86787&oldid=prev127.0.0.1: The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).2023-03-20T11:36:13Z<p>The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 12:36, 20 March 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l19">Line 19:</td>
<td colspan="2" class="diff-lineno">Line 19:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Rc = Cc – Pr [unit production]</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Rc = Cc – Pr [unit production]</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>The presence of reserves is required because of [[risk]] of economic processes. The size of the reserves must be subject to optimization containing maintenance costs and changing [[market]] [[demand]]. [[Knowledge]] of [[production capacity]] is necessary to determine the increase in production (not requiring additional [[investments]]), and for the determination of improving the [[efficiency]] of investment processes.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>The presence of reserves is required because of [[risk]] of economic processes. The size of the reserves must be subject to optimization containing maintenance costs and changing [[market]] [[demand]]. [[Knowledge]] of [[production capacity]] is necessary to determine the increase in production (not requiring additional [[investments]]), and for the determination of improving the [[efficiency]] of <ins style="font-weight: bold; text-decoration: none;">[[</ins>investment<ins style="font-weight: bold; text-decoration: none;">]] </ins>processes.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Intensive Reserve==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Intensive Reserve==</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l38">Line 38:</td>
<td colspan="2" class="diff-lineno">Line 38:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Labor: The number and skill level of the workers involved in the [[production process]] can affect the overall production capacity.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Labor: The number and skill level of the workers involved in the [[production process]] can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Materials and supplies: The availability and [[quality]] of the materials and supplies used in the production process can affect the overall production capacity.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Materials and supplies: The availability and [[quality]] of the materials and supplies used in the production process can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Production process: The efficiency and effectiveness of the production process, including the design of the [[production line]], can affect the overall production capacity.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Production process: The <ins style="font-weight: bold; text-decoration: none;">[[</ins>efficiency and effectiveness<ins style="font-weight: bold; text-decoration: none;">]] </ins>of the production process, including the design of the [[production line]], can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Maintenance: The maintenance schedule and effectiveness of maintenance can affect the overall production capacity.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Maintenance: The maintenance schedule and effectiveness of maintenance can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* [[Market demand]]: The level of market demand for the goods or services being produced can affect the overall production capacity.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* [[Market demand]]: The level of market demand for the goods or services being produced can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* [[Government]] regulations: Compliance with government regulations such as safety, [[environment]], labor laws, and taxes can affect the overall production capacity.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* [[Government]] regulations: Compliance with government regulations such as safety, [[environment]], <ins style="font-weight: bold; text-decoration: none;">[[</ins>labor laws<ins style="font-weight: bold; text-decoration: none;">]]</ins>, and taxes can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Production capacity can be increased by investing in new equipment and machinery, hiring more workers, improving the efficiency and effectiveness of the production process, and increasing market demand. The production capacity can be measured by using [[performance indicators]] such as capacity utilization rate, production yield, and efficiency.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Production capacity can be increased by investing in new equipment and machinery, hiring more workers, improving the efficiency and effectiveness of the production process, and increasing market demand. The production capacity can be measured by using [[performance indicators]] such as capacity utilization rate, production yield, and efficiency.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l68">Line 68:</td>
<td colspan="2" class="diff-lineno">Line 68:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Introduction:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Introduction:</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In addition to the reserve capacity, there are other approaches to measure production reserve. </div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In addition to the reserve capacity, there are other approaches to measure production reserve. </div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Capacity utilization rate (CUR) - is a measure of the percentage of the total capacity that is being used. It is the ratio of actual production output to the maximum potential output, expressed as a percentage.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Capacity utilization rate (CUR) - is a measure of the percentage of the total capacity that is being used. It is the ratio of actual production output to the <ins style="font-weight: bold; text-decoration: none;">[[</ins>maximum potential<ins style="font-weight: bold; text-decoration: none;">]] </ins>output, expressed as a percentage.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Capacity [[planning]] - is a process by which organizations plan for the right amount of resources, such as labor, materials, or equipment, to meet the demand for their products or services.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Capacity [[planning]] - is a process by which organizations plan for the right amount of resources, such as labor, materials, or equipment, to meet the demand for their products or services.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* [[Resource]] utilization - is the process of managing the amount of resources used to produce goods and services. It involves planning, scheduling, and [[controlling]] the use of resources to ensure they are used in the most efficient manner.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* [[Resource]] utilization - is the process of managing the amount of resources used to produce goods and services. It involves planning, scheduling, and [[controlling]] the use of resources to ensure they are used in the most efficient manner.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l74">Line 74:</td>
<td colspan="2" class="diff-lineno">Line 74:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Summary:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Summary:</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>In addition to reserve capacity, other approaches are used to measure production reserve, such as capacity utilization rate, capacity planning, resource utilization, and contingency planning. Each approach has a different purpose, but all are used to ensure that resources are used efficiently and that risks are properly managed.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>In addition to reserve capacity, other approaches are used to measure production reserve, such as capacity utilization rate, capacity planning, <ins style="font-weight: bold; text-decoration: none;">[[</ins>resource utilization<ins style="font-weight: bold; text-decoration: none;">]]</ins>, and contingency planning. Each approach has a different purpose, but all are used to ensure that resources are used efficiently and that risks are properly managed.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td></tr>
</table>127.0.0.1https://ceopedia.org/index.php?title=Production_reserve&diff=84309&oldid=prevSw: Infobox update2023-03-19T22:56:51Z<p>Infobox update</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 23:56, 19 March 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l2">Line 2:</td>
<td colspan="2" class="diff-lineno">Line 2:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|list1=</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>|list1=</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><ul></div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><ul></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><del style="font-weight: bold; text-decoration: none;"><li>[[Just in time]]</li></del></div></td><td colspan="2" class="diff-side-added"></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><li>[[Uniformity of production]]</li></div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><li>[[Uniformity of production]]</li></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><li>[[<del style="font-weight: bold; text-decoration: none;">Pipelined </del>production]]</li></div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><li>[[<ins style="font-weight: bold; text-decoration: none;">Factor of </ins>production]]</li></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><li>[[<del style="font-weight: bold; text-decoration: none;">Muda mura muri</del>]]</li></div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><li>[[<ins style="font-weight: bold; text-decoration: none;">Optimization of the production run-length</ins>]]</li></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><li>[[Determining the length of the production cycle]]</li></div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div><li>[[Determining the length of the production cycle]]</li></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><li>[[<del style="font-weight: bold; text-decoration: none;">Cost avoidance</del>]]</li></div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><li>[[<ins style="font-weight: bold; text-decoration: none;">Direct labor efficiency variance</ins>]]</li></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><li>[[Production <del style="font-weight: bold; text-decoration: none;">cycle</del>]]</li></div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><li>[[Production <ins style="font-weight: bold; text-decoration: none;">capacity</ins>]]</li></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><li>[[<del style="font-weight: bold; text-decoration: none;">Continuous process</del>]]</li></div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><li>[[<ins style="font-weight: bold; text-decoration: none;">Hidden cost</ins>]]</li></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><li>[[<del style="font-weight: bold; text-decoration: none;">Nested production</del>]]</li></div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><li>[[<ins style="font-weight: bold; text-decoration: none;">Indirect labor</ins>]]</li></div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div><li>[[<del style="font-weight: bold; text-decoration: none;">Inventory reserve</del>]]</li></div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><li>[[<ins style="font-weight: bold; text-decoration: none;">Departmental planning</ins>]]</li></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div></ul></div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div></ul></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>}}</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>}}</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Reserve capacity (Rc) is the difference between the size of the calculated capacity (Cc) and achieved the size of [[production]] in the [[enterprise]] (Pr).</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Reserve capacity (Rc) is the difference between the size of the calculated capacity (Cc) and achieved the size of [[production]] in the [[enterprise]] (Pr).</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Production_reserve&diff=72344&oldid=prev127.0.0.1: The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).2023-02-06T15:35:35Z<p>The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 16:35, 6 February 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l46">Line 46:</td>
<td colspan="2" class="diff-lineno">Line 46:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Examples of Production reserve==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Examples of Production reserve==</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Production reserve can refer to the difference between the planned or expected output of a production process and the actual output of the process. For example, a company may plan to manufacture 10,000 units of a certain product, but only manage to produce 9,800 units. The difference, 200 units, is the production reserve.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Production reserve can refer to the difference between the planned or expected output of a production process and the actual output of the process. For example, a <ins style="font-weight: bold; text-decoration: none;">[[</ins>company<ins style="font-weight: bold; text-decoration: none;">]] </ins>may <ins style="font-weight: bold; text-decoration: none;">[[</ins>plan<ins style="font-weight: bold; text-decoration: none;">]] </ins>to manufacture 10,000 units of a certain product, but only manage to produce 9,800 units. The difference, 200 units, is the production reserve.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Production reserve can also refer to the amount of excess capacity that is available to handle any unanticipated increase in demand. For example, a factory may have the capacity to produce 10,000 units of a certain product, but only actually produces 8,000 units. The remaining 2,000 units represent the production reserve, which can be used to meet any additional demand that arises.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Production reserve can also refer to the amount of excess capacity that is available to handle any unanticipated increase in demand. For example, a factory may have the capacity to produce 10,000 units of a certain product, but only actually produces 8,000 units. The remaining 2,000 units represent the production reserve, which can be used to meet any additional demand that arises.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Production reserve can also refer to the difference between the maximum output of a production process and the actual output of the process. For example, a factory may have the capacity to produce 10,000 units of a certain product, but only manages to produce 9,500 units. The difference, 500 units, is the production reserve.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Production reserve can also refer to the difference between the maximum output of a production process and the actual output of the process. For example, a factory may have the capacity to produce 10,000 units of a certain product, but only manages to produce 9,500 units. The difference, 500 units, is the production reserve.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l53">Line 53:</td>
<td colspan="2" class="diff-lineno">Line 53:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Production reserve has a number of advantages for the enterprise:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Production reserve has a number of advantages for the enterprise:</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* It allows the enterprise to plan its production in advance, accounting for potential disruptions, supply chain problems, and other unexpected events. This helps to avoid any delays in production, thus increasing productivity.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* It allows the enterprise to plan its production in advance, accounting for potential disruptions, supply chain problems, and other unexpected events. This helps to avoid any delays in production, thus increasing productivity.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* It also helps the enterprise to remain competitive in the market by helping it to quickly respond to customer needs and orders.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* It also helps the enterprise to remain competitive in the market by helping it to quickly respond to <ins style="font-weight: bold; text-decoration: none;">[[</ins>customer<ins style="font-weight: bold; text-decoration: none;">]] [[</ins>needs<ins style="font-weight: bold; text-decoration: none;">]] </ins>and orders.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The reserve also helps to reduce costs, since it allows the enterprise to plan its production in advance, thus avoiding any unnecessary costs for materials, labor, and other resources.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The reserve also helps to reduce costs, since it allows the enterprise to plan its production in advance, thus avoiding any unnecessary costs for materials, labor, and other resources.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The reserve also gives the enterprise a buffer zone of security in case of any unexpected events, thus providing a sense of stability in times of uncertainty.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* The reserve also gives the enterprise a buffer zone of security in case of any unexpected events, thus providing a sense of stability in times of uncertainty.</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l62">Line 62:</td>
<td colspan="2" class="diff-lineno">Line 62:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* It does not take into account the uncertainty of demand - the actual demand for a product can be different than what was predicted and the production reserve may not be enough to cover the difference.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* It does not take into account the uncertainty of demand - the actual demand for a product can be different than what was predicted and the production reserve may not be enough to cover the difference.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* It does not account for internal and external factors that can affect production capacity, such as unexpected breakdowns or changes in the market.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* It does not account for internal and external factors that can affect production capacity, such as unexpected breakdowns or changes in the market.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* It does not consider the cost of setting up the production reserve, which can be significant.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* It does not consider the <ins style="font-weight: bold; text-decoration: none;">[[</ins>cost<ins style="font-weight: bold; text-decoration: none;">]] </ins>of setting up the production reserve, which can be significant.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* It can be difficult to accurately determine how much production reserve is necessary and when it should be deployed.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* It can be difficult to accurately determine how much production reserve is necessary and when it should be deployed.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l69">Line 69:</td>
<td colspan="2" class="diff-lineno">Line 69:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In addition to the reserve capacity, there are other approaches to measure production reserve. </div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>In addition to the reserve capacity, there are other approaches to measure production reserve. </div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Capacity utilization rate (CUR) - is a measure of the percentage of the total capacity that is being used. It is the ratio of actual production output to the maximum potential output, expressed as a percentage.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Capacity utilization rate (CUR) - is a measure of the percentage of the total capacity that is being used. It is the ratio of actual production output to the maximum potential output, expressed as a percentage.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Capacity planning - is a process by which organizations plan for the right amount of resources, such as labor, materials, or equipment, to meet the demand for their products or services.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Capacity <ins style="font-weight: bold; text-decoration: none;">[[</ins>planning<ins style="font-weight: bold; text-decoration: none;">]] </ins>- is a process by which organizations plan for the right amount of resources, such as labor, materials, or equipment, to meet the demand for their products or services.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Resource utilization - is the process of managing the amount of resources used to produce goods and services. It involves planning, scheduling, and controlling the use of resources to ensure they are used in the most efficient manner.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* <ins style="font-weight: bold; text-decoration: none;">[[</ins>Resource<ins style="font-weight: bold; text-decoration: none;">]] </ins>utilization - is the process of managing the amount of resources used to produce goods and services. It involves planning, scheduling, and <ins style="font-weight: bold; text-decoration: none;">[[</ins>controlling<ins style="font-weight: bold; text-decoration: none;">]] </ins>the use of resources to ensure they are used in the most efficient manner.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Contingency planning - is the process of preparing for and responding to potential future events that could have a negative impact on the success of an organization. It involves the identification of risks, the development of strategies to address them, and the implementation of those strategies.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Contingency planning - is the process of preparing for and responding to potential future events that could have a negative impact on the success of an <ins style="font-weight: bold; text-decoration: none;">[[</ins>organization<ins style="font-weight: bold; text-decoration: none;">]]</ins>. It involves the <ins style="font-weight: bold; text-decoration: none;">[[</ins>identification<ins style="font-weight: bold; text-decoration: none;">]] </ins>of risks, the development of strategies to address them, and the implementation of those strategies.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Summary:</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Summary:</div></td></tr>
</table>127.0.0.1https://ceopedia.org/index.php?title=Production_reserve&diff=72343&oldid=prevSw: Article improvement2023-02-06T15:35:13Z<p>Article improvement</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 16:35, 6 February 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l44">Line 44:</td>
<td colspan="2" class="diff-lineno">Line 44:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Production capacity can be increased by investing in new equipment and machinery, hiring more workers, improving the efficiency and effectiveness of the production process, and increasing market demand. The production capacity can be measured by using [[performance indicators]] such as capacity utilization rate, production yield, and efficiency.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Production capacity can be increased by investing in new equipment and machinery, hiring more workers, improving the efficiency and effectiveness of the production process, and increasing market demand. The production capacity can be measured by using [[performance indicators]] such as capacity utilization rate, production yield, and efficiency.</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">==Examples of Production reserve==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Production reserve can refer to the difference between the planned or expected output of a production process and the actual output of the process. For example, a company may plan to manufacture 10,000 units of a certain product, but only manage to produce 9,800 units. The difference, 200 units, is the production reserve.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Production reserve can also refer to the amount of excess capacity that is available to handle any unanticipated increase in demand. For example, a factory may have the capacity to produce 10,000 units of a certain product, but only actually produces 8,000 units. The remaining 2,000 units represent the production reserve, which can be used to meet any additional demand that arises.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Production reserve can also refer to the difference between the maximum output of a production process and the actual output of the process. For example, a factory may have the capacity to produce 10,000 units of a certain product, but only manages to produce 9,500 units. The difference, 500 units, is the production reserve.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">==Advantages of Production reserve==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">Production reserve has a number of advantages for the enterprise:</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* It allows the enterprise to plan its production in advance, accounting for potential disruptions, supply chain problems, and other unexpected events. This helps to avoid any delays in production, thus increasing productivity.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* It also helps the enterprise to remain competitive in the market by helping it to quickly respond to customer needs and orders.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* The reserve also helps to reduce costs, since it allows the enterprise to plan its production in advance, thus avoiding any unnecessary costs for materials, labor, and other resources.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* The reserve also gives the enterprise a buffer zone of security in case of any unexpected events, thus providing a sense of stability in times of uncertainty.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Finally, the reserve capacity allows the enterprise to grow and expand its production without having to worry about capacity constraints. This enables the enterprise to better serve its customers, providing them with better quality products and services.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">==Limitations of Production reserve==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">Production reserve has several limitations:</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* It does not take into account the uncertainty of demand - the actual demand for a product can be different than what was predicted and the production reserve may not be enough to cover the difference.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* It does not account for internal and external factors that can affect production capacity, such as unexpected breakdowns or changes in the market.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* It does not consider the cost of setting up the production reserve, which can be significant.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* It can be difficult to accurately determine how much production reserve is necessary and when it should be deployed.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">==Other approaches related to Production reserve==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">Introduction:</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">In addition to the reserve capacity, there are other approaches to measure production reserve. </ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Capacity utilization rate (CUR) - is a measure of the percentage of the total capacity that is being used. It is the ratio of actual production output to the maximum potential output, expressed as a percentage.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Capacity planning - is a process by which organizations plan for the right amount of resources, such as labor, materials, or equipment, to meet the demand for their products or services.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Resource utilization - is the process of managing the amount of resources used to produce goods and services. It involves planning, scheduling, and controlling the use of resources to ensure they are used in the most efficient manner.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Contingency planning - is the process of preparing for and responding to potential future events that could have a negative impact on the success of an organization. It involves the identification of risks, the development of strategies to address them, and the implementation of those strategies.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">Summary:</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">In addition to reserve capacity, other approaches are used to measure production reserve, such as capacity utilization rate, capacity planning, resource utilization, and contingency planning. Each approach has a different purpose, but all are used to ensure that resources are used efficiently and that risks are properly managed.</ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Production_reserve&diff=69581&oldid=prev127.0.0.1: The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).2023-01-20T22:43:45Z<p>The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).</p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 23:43, 20 January 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l34">Line 34:</td>
<td colspan="2" class="diff-lineno">Line 34:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Production capacity==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Production capacity==</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>Production capacity refers to the maximum amount of goods or services that a production system can produce within a given period of time. It is often measured in terms of output per unit of time, such as units per hour, units per day, or units per month. Production capacity can be influenced by a variety of factors, including:</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>Production capacity refers to the maximum amount of goods or services that a production <ins style="font-weight: bold; text-decoration: none;">[[</ins>system<ins style="font-weight: bold; text-decoration: none;">]] </ins>can produce within a given period of time. It is often measured in terms of output per unit of time, such as units per hour, units per day, or units per month. Production capacity can be influenced by a variety of factors, including:</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Equipment and machinery: The type, condition, and capacity of the equipment and machinery used in the production process can affect the overall production capacity.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Equipment and machinery: The type, condition, and capacity of the equipment and machinery used in the production <ins style="font-weight: bold; text-decoration: none;">[[</ins>process<ins style="font-weight: bold; text-decoration: none;">]] </ins>can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Labor: The number and skill level of the workers involved in the production process can affect the overall production capacity.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Labor: The number and skill level of the workers involved in the <ins style="font-weight: bold; text-decoration: none;">[[</ins>production process<ins style="font-weight: bold; text-decoration: none;">]] </ins>can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Materials and supplies: The availability and quality of the materials and supplies used in the production process can affect the overall production capacity.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Materials and supplies: The availability and <ins style="font-weight: bold; text-decoration: none;">[[</ins>quality<ins style="font-weight: bold; text-decoration: none;">]] </ins>of the materials and supplies used in the production process can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Production process: The efficiency and effectiveness of the production process, including the design of the production line, can affect the overall production capacity.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* Production process: The efficiency and effectiveness of the production process, including the design of the <ins style="font-weight: bold; text-decoration: none;">[[</ins>production line<ins style="font-weight: bold; text-decoration: none;">]]</ins>, can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Maintenance: The maintenance schedule and effectiveness of maintenance can affect the overall production capacity.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Maintenance: The maintenance schedule and effectiveness of maintenance can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Market demand: The level of market demand for the goods or services being produced can affect the overall production capacity.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* <ins style="font-weight: bold; text-decoration: none;">[[</ins>Market demand<ins style="font-weight: bold; text-decoration: none;">]]</ins>: The level of market demand for the goods or services being produced can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>* Government regulations: Compliance with government regulations such as safety, environment, labor laws, and taxes can affect the overall production capacity.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>* <ins style="font-weight: bold; text-decoration: none;">[[</ins>Government<ins style="font-weight: bold; text-decoration: none;">]] </ins>regulations: Compliance with government regulations such as safety, <ins style="font-weight: bold; text-decoration: none;">[[</ins>environment<ins style="font-weight: bold; text-decoration: none;">]]</ins>, labor laws, and taxes can affect the overall production capacity.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker" data-marker="−"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;"><div>Production capacity can be increased by investing in new equipment and machinery, hiring more workers, improving the efficiency and effectiveness of the production process, and increasing market demand. The production capacity can be measured by using performance indicators such as capacity utilization rate, production yield, and efficiency.</div></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div>Production capacity can be increased by investing in new equipment and machinery, hiring more workers, improving the efficiency and effectiveness of the production process, and increasing market demand. The production capacity can be measured by using <ins style="font-weight: bold; text-decoration: none;">[[</ins>performance indicators<ins style="font-weight: bold; text-decoration: none;">]] </ins>such as capacity utilization rate, production yield, and efficiency.</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td></tr>
</table>127.0.0.1https://ceopedia.org/index.php?title=Production_reserve&diff=69345&oldid=prevSw at 11:58, 20 January 20232023-01-20T11:58:13Z<p></p>
<table style="background-color: #fff; color: #202122;" data-mw="interface">
<col class="diff-marker" />
<col class="diff-content" />
<col class="diff-marker" />
<col class="diff-content" />
<tr class="diff-title" lang="en">
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">← Older revision</td>
<td colspan="2" style="background-color: #fff; color: #202122; text-align: center;">Revision as of 12:58, 20 January 2023</td>
</tr><tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l26">Line 26:</td>
<td colspan="2" class="diff-lineno">Line 26:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* reduce the participation of auxiliary time and other components in general time of operation</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* reduce the participation of auxiliary time and other components in general time of operation</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* elimination of non-productive run of machines</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* elimination of non-productive run of machines</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Extensive Reserve ==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==Extensive Reserve ==</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Extensive reserves are connected with idle operation of machinery and equipment</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>Extensive reserves are connected with idle operation of machinery and equipment</div></td></tr>
<tr><td colspan="2" class="diff-lineno" id="mw-diff-left-l31">Line 31:</td>
<td colspan="2" class="diff-lineno">Line 32:</td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Loss - breaks due to lengthy repairs, accidents, lack of materials, and other organizational issues</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Loss - breaks due to lengthy repairs, accidents, lack of materials, and other organizational issues</div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Breaks during the [[work]] day - regular break for employees to reduce fatigue. Some downtime due to the fault of the worker: the [[absence]] of work, being late to work, early finishing of work.</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>* Breaks during the [[work]] day - regular break for employees to reduce fatigue. Some downtime due to the fault of the worker: the [[absence]] of work, being late to work, early finishing of work.</div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">==Production capacity==</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">Production capacity refers to the maximum amount of goods or services that a production system can produce within a given period of time. It is often measured in terms of output per unit of time, such as units per hour, units per day, or units per month. Production capacity can be influenced by a variety of factors, including:</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Equipment and machinery: The type, condition, and capacity of the equipment and machinery used in the production process can affect the overall production capacity.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Labor: The number and skill level of the workers involved in the production process can affect the overall production capacity.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Materials and supplies: The availability and quality of the materials and supplies used in the production process can affect the overall production capacity.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Production process: The efficiency and effectiveness of the production process, including the design of the production line, can affect the overall production capacity.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Maintenance: The maintenance schedule and effectiveness of maintenance can affect the overall production capacity.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Market demand: The level of market demand for the goods or services being produced can affect the overall production capacity.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">* Government regulations: Compliance with government regulations such as safety, environment, labor laws, and taxes can affect the overall production capacity.</ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;"></ins></div></td></tr>
<tr><td colspan="2" class="diff-side-deleted"></td><td class="diff-marker" data-marker="+"></td><td style="color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;"><div><ins style="font-weight: bold; text-decoration: none;">Production capacity can be increased by investing in new equipment and machinery, hiring more workers, improving the efficiency and effectiveness of the production process, and increasing market demand. The production capacity can be measured by using performance indicators such as capacity utilization rate, production yield, and efficiency.</ins></div></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><br/></td></tr>
<tr><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td><td class="diff-marker"></td><td style="background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;"><div>==References==</div></td></tr>
</table>Swhttps://ceopedia.org/index.php?title=Production_reserve&diff=59052&oldid=prevSw at 20:01, 1 December 20192019-12-01T20:01:47Z<p></p>
<p><b>New page</b></p><div>{{infobox4<br />
|list1=<br />
<ul><br />
<li>[[Just in time]]</li><br />
<li>[[Uniformity of production]]</li><br />
<li>[[Pipelined production]]</li><br />
<li>[[Muda mura muri]]</li><br />
<li>[[Determining the length of the production cycle]]</li><br />
<li>[[Cost avoidance]]</li><br />
<li>[[Production cycle]]</li><br />
<li>[[Continuous process]]</li><br />
<li>[[Nested production]]</li><br />
<li>[[Inventory reserve]]</li><br />
</ul><br />
}}<br />
<br />
Reserve capacity (Rc) is the difference between the size of the calculated capacity (Cc) and achieved the size of [[production]] in the [[enterprise]] (Pr).<br />
<br />
Rc = Cc – Pr [unit production]<br />
<br />
The presence of reserves is required because of [[risk]] of economic processes. The size of the reserves must be subject to optimization containing maintenance costs and changing [[market]] [[demand]]. [[Knowledge]] of [[production capacity]] is necessary to determine the increase in production (not requiring additional [[investments]]), and for the determination of improving the [[efficiency]] of investment processes.<br />
<br />
==Intensive Reserve==<br />
They can be used by:<br />
* reduce machine time per unit of the [[product]]<br />
* reduce the participation of auxiliary time and other components in general time of operation<br />
* elimination of non-productive run of machines<br />
==Extensive Reserve ==<br />
Extensive reserves are connected with idle operation of machinery and equipment<br />
* Downtime – device idle time due to lack of workers or during refurbishment, * Whole shift downtime - caused by prolonged preparatory time of machinery and equipment.<br />
* Loss - breaks due to lengthy repairs, accidents, lack of materials, and other organizational issues<br />
* Breaks during the [[work]] day - regular break for employees to reduce fatigue. Some downtime due to the fault of the worker: the [[absence]] of work, being late to work, early finishing of work.<br />
<br />
==References==<br />
* Kleindorfer, P. R., Singhal, K., & Wassenhove, L. N. (2005). ''[http://www.icesi.edu.co/blogs/semillerosi3/files/2013/12/06-04-PK.pdf Sustainable operations management]''. Production and operations [[management]], 14(4), 482-492.<br />
<br />
[[Category:Production management]]<br />
[[pl:Rezerwa produkcyjna]]</div>Sw