Product cost: Difference between revisions

From CEOpedia | Management online
m (→‎Fixed vs. Variable Cost: typos fixed: eg → e.g.)
 
(The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).)
Line 37: Line 37:
==Cost estimation techniques==
==Cost estimation techniques==
* Algorithmic technique
* Algorithmic technique
* Fuzzy logic approach <ref>Manufacturing cost modelling for concurrent product development, (2001) p.347 </ref>.  
* Fuzzy logic approach <ref>[[Manufacturing cost]] modelling for concurrent product development, (2001) p.347 </ref>.  


==References==
==References==

Revision as of 23:34, 20 January 2023

Product cost
See also


Produkt cost includes costs that are directly related to the product and a reasonable part of the costs indirectly associated with the production of this product.

A good cost estimation has a direct impact on performance and efficiency of a business enterprise. This may result in the loss of the company and goodwill on the market or large losses for the company. Cost estimation is the focal point of design and operational strategies and a key agenda for managerial policies and business. Also the client's satisfaction in terms of low costs, high quality and product delivery on time play a significant role [1].

Types of product costs

At the cost of producing the product (product cost) consists of the following items[2],:

  • direct materials
  • purchase costs,
  • own semi-finished products,
  • fuel and technological energy,
  • direct wages,
  • other direct costs.

Fixed vs. Variable Cost

Fixed cost - cost that the company incurs even during the period in which production is equal to zero. They remain unchanged (constans) for a wide range of activities over a period of time and may change over time, e.g. due to a change in macroeconomic conditions. Typical factors affecting the change in the level of fixed costs include, for example: changes in the organization of the enterprise, changes in the technology used, sales of machinery and production equipment

Variable cost - the cost the entrepreneur incurs for activities directly related to production. Resources that the company uses, for example: machinery, buildings or human resources [3].

Cost estimation techniques

  • Algorithmic technique
  • Fuzzy logic approach [4].

References

Footnotes

  1. Product Cost Estimation: Technique Classification and Methodology Review, MAY 2006, Vol. 128/ 563
  2. Direct materials deposition: designed macro and microstructure (1999)
  3. How cost accounting distorts product costs, Apr 1988, p.20
  4. Manufacturing cost modelling for concurrent product development, (2001) p.347


Author: Paulina Ściera

.