Network charts: Difference between revisions

From CEOpedia | Management online
m (Article improvement)
m (Infobox5 upgrade)
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{infobox4
|list1=
<ul>
<li>[[Feature-driven development]]</li>
<li>[[Critical chain method]]</li>
<li>[[MoSCoW technique]]</li>
<li>[[Henry Laurence Gantt]]</li>
<li>[[Single minute exchange of die]]</li>
<li>[[Product backlog]]</li>
<li>[[Sprint backlog]]</li>
<li>[[Organizational techniques]]</li>
<li>[[Project lifecycle]]</li>
</ul>
}}
'''Network charts''' is a group of methods developed in the late 50's and 60 projects for the defense [[industry]] of the United States. Despite its age, they are still widely used. Two of the most famous network charts are:
'''Network charts''' is a group of methods developed in the late 50's and 60 projects for the defense [[industry]] of the United States. Despite its age, they are still widely used. Two of the most famous network charts are:
* CPM - Critical Path [[Method]]
* CPM - Critical Path [[Method]]
Line 64: Line 48:


==Critical path method CPM==
==Critical path method CPM==
This method was developed in 1956-1957 in the United States by Du Pont de Nemours & Co. It was used to manage the maintenance of the equipment and bring order to the [[organization]], which had lead to an increase in the [[efficiency]] of the [[company]]. There is no clearly defined method of presentation of the network chart for the [[critical path method]]. To be able to use the method CPM it is necessary to have data on the duration of individual actions. CPM method is designed to determine the overall execution time or date of completion of the project.  
This method was developed in 1956-1957 in the United States by Du Pont de Nemours & Co. It was used to manage the maintenance of the equipment and bring order to the [[organization]], which had lead to an increase in the [[efficiency]] of the [[company]]. There is no clearly defined method of presentation of the network chart for the [[critical path method]]. To be able to use the method CPM it is necessary to have data on the duration of individual actions. CPM method is designed to determine the overall execution time or date of [[completion of the project]].  


==PERT - Program Evaluation and Review Technique==
==PERT - Program Evaluation and Review Technique==
Line 71: Line 55:
==Examples of Network charts==
==Examples of Network charts==
* '''PERT (Program Evaluation and Review Technique)''': PERT is a charting technique used to analyze and represent the tasks and activities in a project. It assigns duration estimates to each task and shows the sequence of tasks and their dependencies. This chart is used to identify the critical path (the shortest path to the completion of a project) and to estimate the total project duration. An example of a PERT chart is a project for the construction of a new office building. The PERT chart would include the sequence of tasks necessary for the project, such as acquiring permits, hiring contractors, laying the foundation, and so on.
* '''PERT (Program Evaluation and Review Technique)''': PERT is a charting technique used to analyze and represent the tasks and activities in a project. It assigns duration estimates to each task and shows the sequence of tasks and their dependencies. This chart is used to identify the critical path (the shortest path to the completion of a project) and to estimate the total project duration. An example of a PERT chart is a project for the construction of a new office building. The PERT chart would include the sequence of tasks necessary for the project, such as acquiring permits, hiring contractors, laying the foundation, and so on.
* '''Gantt Chart''': A Gantt chart is a type of bar chart that is used to illustrate a project schedule. It shows a timeline of the project, including its various tasks, the duration of each task, and the dependencies between tasks. An example of a Gantt chart is a project to build a new website. The Gantt chart would show all the tasks required for the project, such as designing the website, coding the website, testing the website, and launching the website. It would also show the time needed to complete each task and the dependencies between tasks.
* '''Gantt Chart''': A Gantt chart is a type of bar chart that is used to illustrate a [[project schedule]]. It shows a timeline of the project, including its various tasks, the duration of each task, and the dependencies between tasks. An example of a Gantt chart is a project to build a new website. The Gantt chart would show all the tasks required for the project, such as designing the website, coding the website, testing the website, and launching the website. It would also show the time needed to complete each task and the dependencies between tasks.


==Limitations of Network charts==
==Limitations of Network charts==
Network charts are powerful tools for project management and organizational planning, but there are a few notable limitations to them. These include:  
Network charts are powerful tools for project management and [[organizational planning]], but there are a few notable limitations to them. These include:  
* They cannot properly represent projects with multiple, simultaneous dependencies or tasks that overlap.  
* They cannot properly represent projects with multiple, simultaneous dependencies or tasks that overlap.  
* They cannot effectively deal with the complexity of projects with many tasks and resources.  
* They cannot effectively deal with the complexity of projects with many tasks and resources.  
Line 90: Line 74:


In summary, Network charts are still widely used in the defense industry today and there are several related approaches that can be used to analyze and represent the sequence of tasks and activities of a project. These include Activity-on-Node (AON), Activity-on-Arrow (AOA), Program Evaluation and Review Technique (PERT), and Gantt Charts.
In summary, Network charts are still widely used in the defense industry today and there are several related approaches that can be used to analyze and represent the sequence of tasks and activities of a project. These include Activity-on-Node (AON), Activity-on-Arrow (AOA), Program Evaluation and Review Technique (PERT), and Gantt Charts.
{{infobox5|list1={{i5link|a=[[Critical path method]]}} &mdash; {{i5link|a=[[Henry Laurence Gantt]]}} &mdash; {{i5link|a=[[Feature-driven development]]}} &mdash; {{i5link|a=[[Project status report]]}} &mdash; {{i5link|a=[[Cycle time]]}} &mdash; {{i5link|a=[[Sprint backlog]]}} &mdash; {{i5link|a=[[Product backlog]]}} &mdash; {{i5link|a=[[Arrow diagram]]}} &mdash; {{i5link|a=[[Algorithm]]}} }}


==References==
==References==

Latest revision as of 23:11, 17 November 2023

Network charts is a group of methods developed in the late 50's and 60 projects for the defense industry of the United States. Despite its age, they are still widely used. Two of the most famous network charts are:

The basic principle underlying the design of network charts is possible existence of simultaneous tasks that are not dependent on each other. This results in significant time savings. Most of the modern software used for project management draws network charts.

Procedure for creating network chart

  • split project into tasks and activities
  • determine the logical consequences of particular tasks and activities
  • estimate duration of each action/task
  • put all tasks on network graph
  • determine the earliest possible and of latest allowable times of occurrence of each task
  • calculate time reserves for each task
  • determine critical path of tasks without time reserves
  • improve network of tasks by shortening the critical path

Principles of constructing network charts

Fig. 1. Example of CPM chart
  • first task do not have prior activity
  • final task do not have steps after it
  • every diagram have initial and final event and all the activities connecting then
  • event can not take place until the end in all the steps leading to it
  • subsequent task can not begin until an event occurs
  • between the two events may be only one action plotted
  • vectors of tasks should be directed from left to right
  • intersections of vectors should be avoided
  • network diagram branches out in the direction of operations from left to right
  • network diagram should not have closed circuits, i.e. the loop connecting twice the same events
  • each network diagram should be agreed with the responsible contractors
  • check the order of operations, accuracy of links (parallel activities), and then perform the calculation of the duration of the entire project, slack time and mark a critical path.

Basic concepts

  • task - action with specified time (having the duration). CPM diagram indicates it is an arrow, while in PERT it is a rectangle
  • event - the moment of the end or the start of operations. It is a point of time therefore does not have its time dimension. On CPM charts it is marked as a circle divided into 4 parts. In the upper part is the sequence number, on the left of the earliest possible date, on the right of latest permissible date, at the bottom the reserve of time is indicated.
  • critical path - the path from the first to the last event with all subsequent events and activities having a zero reserve of time.
  • earliest possible date of occurrence - maximum value according to the principle that an event can occur when previously completed all the steps preceding it. For the first event value is "0".
  • latest permissible date of occurrence
  • reserve time - equal to the difference between latest permissible date of occurrence and earliest possible date of occurrence. Sequence of activities for which time reserve is "0" is called Critical Path.

Advantages of network charts

Application of the network charts allows to:

  • reduce the duration of the project without any additional organizational changes and expenditures
  • reduce the overall costs of design and implementation of complex changes
  • increase rational use of time reserves
  • focus attention on activities critical to the entire project
  • facilitate planning and setting realistic deadlines for completion
  • create a basis for checking the progress of work in efficient way

Critical path method CPM

This method was developed in 1956-1957 in the United States by Du Pont de Nemours & Co. It was used to manage the maintenance of the equipment and bring order to the organization, which had lead to an increase in the efficiency of the company. There is no clearly defined method of presentation of the network chart for the critical path method. To be able to use the method CPM it is necessary to have data on the duration of individual actions. CPM method is designed to determine the overall execution time or date of completion of the project.

PERT - Program Evaluation and Review Technique

PERT method was created in 1958 in the United States by mathematicians working with the US Office of Naval Systems. PERT method is used for unique operations. It is a stochastic model, because the duration of individual actions is not determined exactly, only with a certain probability. This makes it easier to apply but only using the appropriate computer program due to high complexity of calculations. In PERT method, to each step we assign four time estimates: the optimistic, most likely, pessimistic and expected.

Examples of Network charts

  • PERT (Program Evaluation and Review Technique): PERT is a charting technique used to analyze and represent the tasks and activities in a project. It assigns duration estimates to each task and shows the sequence of tasks and their dependencies. This chart is used to identify the critical path (the shortest path to the completion of a project) and to estimate the total project duration. An example of a PERT chart is a project for the construction of a new office building. The PERT chart would include the sequence of tasks necessary for the project, such as acquiring permits, hiring contractors, laying the foundation, and so on.
  • Gantt Chart: A Gantt chart is a type of bar chart that is used to illustrate a project schedule. It shows a timeline of the project, including its various tasks, the duration of each task, and the dependencies between tasks. An example of a Gantt chart is a project to build a new website. The Gantt chart would show all the tasks required for the project, such as designing the website, coding the website, testing the website, and launching the website. It would also show the time needed to complete each task and the dependencies between tasks.

Limitations of Network charts

Network charts are powerful tools for project management and organizational planning, but there are a few notable limitations to them. These include:

  • They cannot properly represent projects with multiple, simultaneous dependencies or tasks that overlap.
  • They cannot effectively deal with the complexity of projects with many tasks and resources.
  • They do not take into account the amount of time available to complete tasks or the amount of resources available, which can lead to unrealistic expectations.
  • They cannot be used to compare projects of different sizes or scopes.
  • They do not provide a complete picture of the project, and are limited to only showing direct relationships between tasks.
  • They are not suitable for use in dynamic project environments, as changes must be manually updated in the chart.

Other approaches related to Network charts

Network charts are still widely used today and are a mainstay in the defense industry of the United States. Here are other approaches related to Network charts:

  • Activity-on-Node (AON): AON is a type of network chart used to visually map out the sequence of tasks and activities of a project. It uses nodes to represent activities and arrows to indicate the dependencies between them.
  • Activity-on-Arrow (AOA): AOA is another type of network chart used to represent the sequence of tasks and activities of a project. It uses arrows to represent activities and arrows to indicate the dependencies between them.
  • Program Evaluation and Review Technique (PERT): PERT is a network chart used to analyze the duration of a project and the sequence of tasks and activities involved. It uses nodes to represent tasks and arrows to show the sequence of activities.
  • Gantt Charts: Gantt Charts are a type of bar chart used to show the timeline of a project and the tasks involved. It is commonly used to represent the progress of a project over time.

In summary, Network charts are still widely used in the defense industry today and there are several related approaches that can be used to analyze and represent the sequence of tasks and activities of a project. These include Activity-on-Node (AON), Activity-on-Arrow (AOA), Program Evaluation and Review Technique (PERT), and Gantt Charts.


Network chartsrecommended articles
Critical path methodHenry Laurence GanttFeature-driven developmentProject status reportCycle timeSprint backlogProduct backlogArrow diagramAlgorithm