Advanced planning and scheduling: Difference between revisions
(New article) |
(The LinkTitles extension automatically added links to existing pages (<a target="_blank" rel="noreferrer noopener" class="external free" href="https://github.com/bovender/LinkTitles">https://github.com/bovender/LinkTitles</a>).) |
||
Line 15: | Line 15: | ||
'''Advanced Planning and Scheduling (APS)''' is based on the principles of production planning and control and helps companies increase their production speed and accuracy. It can be used in projects with complex requirements, such as those with multiple processes, multiple resources, and multiple constraints. APS helps to identify and resolve any potential scheduling conflicts and ensure that the project is completed on time and on budget. | '''Advanced [[Planning]] and Scheduling (APS)''' is based on the principles of [[production]] [[planning and control]] and helps companies increase their production speed and accuracy. It can be used in projects with complex requirements, such as those with multiple processes, multiple resources, and multiple constraints. APS helps to identify and resolve any potential scheduling conflicts and ensure that the [[project]] is completed on time and on budget. | ||
Using APS, companies can make better decisions about resource allocation and prioritize tasks more effectively. By optimizing resources and minimizing delays in production, companies can reduce wasted time, money, and effort. In addition, APS can help organizations better understand the potential risks of their production process and plan accordingly. | Using APS, companies can make better decisions about [[resource]] allocation and prioritize tasks more effectively. By optimizing resources and minimizing delays in production, companies can reduce wasted time, [[money]], and effort. In addition, APS can help organizations better understand the potential risks of their production [[process]] and [[plan]] accordingly. | ||
If you’re looking to improve the efficiency of your production process, Advanced Planning and Scheduling is a great option. It can help you save time, money, and effort, while also ensuring that your project is completed on time and within budget. Try it today and see the results for yourself! | If you’re looking to improve the [[efficiency]] of your [[production process]], Advanced Planning and Scheduling is a great [[option]]. It can help you save time, money, and effort, while also ensuring that your project is completed on time and within budget. Try it today and see the results for yourself! | ||
==Industry-specific Examples of Advanced Planning and Scheduling== | ==Industry-specific Examples of Advanced Planning and Scheduling== | ||
Advanced planning and scheduling is becoming increasingly important in today’s business world. It can make the difference between success and failure in a variety of industries, from construction and manufacturing to IT and healthcare. | Advanced [[planning and scheduling]] is becoming increasingly important in today’s business world. It can make the difference between success and failure in a variety of industries, from construction and manufacturing to IT and healthcare. | ||
In the '''construction industry''', advanced scheduling techniques involve breaking down projects into smaller components, managing resources, and optimizing resource utilization. Planning software can help with this process, making it easier and faster to get the job done. In the '''manufacturing sector''', advanced planning and scheduling includes forecasting and inventory management systems, as well as the integration of supply chain planning with production scheduling. | In the '''construction [[industry]]''', advanced scheduling techniques involve breaking down projects into smaller components, managing resources, and optimizing resource utilization. Planning software can help with this process, making it easier and faster to get the job done. In the '''manufacturing sector''', advanced planning and scheduling includes [[forecasting]] and inventory [[management]] systems, as well as the integration of supply chain planning with production scheduling. | ||
In the '''IT industry''', advanced planning and scheduling involves the use of project management tools such as Gantt charts, PERT diagrams, Critical Path Method (CPM), and Earned Value Management (EVM) to plan and track projects. For '''healthcare''', advanced planning and scheduling involves the use of scheduling software to automate appointment scheduling, as well as the use of predictive analytics to forecast patient demand. And in the '''education sector''', advanced scheduling techniques involve the use of scheduling tools to assign classes and teachers to students, as well as the use of predictive analytics to forecast student enrollment. | In the '''IT industry''', advanced planning and scheduling involves the use of [[project management]] tools such as Gantt charts, PERT diagrams, Critical Path [[Method]] (CPM), and Earned Value Management (EVM) to plan and track projects. For '''healthcare''', advanced planning and scheduling involves the use of scheduling software to automate appointment scheduling, as well as the use of predictive analytics to forecast patient [[demand]]. And in the '''[[education]] sector''', advanced scheduling techniques involve the use of scheduling tools to assign classes and teachers to students, as well as the use of predictive analytics to forecast student enrollment. | ||
Advanced planning and scheduling is an essential part of running a successful business. It’s not just about getting the job done faster; it’s about getting the job done more efficiently and effectively. With the right tools and techniques, any business can make the most of their resources and maximize their success. | Advanced planning and scheduling is an essential part of running a successful business. It’s not just about getting the job done faster; it’s about getting the job done more efficiently and effectively. With the right tools and techniques, any business can make the most of their resources and maximize their success. | ||
==Benefits of Implementing Advanced Planning and Scheduling== | ==Benefits of Implementing Advanced Planning and Scheduling== | ||
Advanced planning and scheduling methods can be a great way to do just that. It can help reduce costs, improve communication, reduce the risk of delays, and even improve customer satisfaction. Let's take a look at how advanced planning and scheduling can make a difference. | Advanced planning and scheduling methods can be a great way to do just that. It can help reduce costs, improve [[communication]], reduce the [[risk]] of delays, and even improve [[customer]] satisfaction. Let's take a look at how advanced planning and scheduling can make a difference. | ||
Advanced planning and scheduling '''can provide better visibility into the progress of your project''', as well as potential risks. This can help you make more efficient use of your resources and plan ahead for potential problems. Additionally, it can provide a clearer view of the project timeline, which can help improve communication between project members and stakeholders. | Advanced planning and scheduling '''can provide better visibility into the progress of your project''', as well as potential risks. This can help you make more efficient use of your resources and plan ahead for potential problems. Additionally, it can provide a clearer view of the project timeline, which can help improve communication between project members and [[stakeholders]]. | ||
Having visibility into the project timeline can also help '''reduce the risk of delays or cost overruns'''. Advanced planning and scheduling can identify potential issues early on, giving you more time to address them. This can help keep your project on track and within budget. | Having visibility into the project timeline can also help '''reduce the risk of delays or [[cost]] overruns'''. Advanced planning and scheduling can identify potential issues early on, giving you more time to address them. This can help keep your project on track and within budget. | ||
Finally, advanced planning and scheduling can help '''improve the overall quality of your project'''. It can help you identify areas that need improvement and make sure that your project is completed on time and within budget. This can help ensure customer satisfaction and make sure that your project is a success. | Finally, advanced planning and scheduling can help '''improve the overall [[quality]] of your project'''. It can help you identify areas that [[need]] improvement and make sure that your project is completed on time and within budget. This can help ensure [[customer satisfaction]] and make sure that your project is a success. | ||
Advanced planning and scheduling can be a great way to improve the success rate of your projects. It can help you reduce costs, improve communication, reduce the risk of delays, and even improve customer satisfaction. If you're looking for ways to make sure that your project is a success, consider incorporating advanced planning and scheduling methods into your project strategy. | Advanced planning and scheduling can be a great way to improve the success rate of your projects. It can help you reduce costs, improve communication, reduce the risk of delays, and even improve customer satisfaction. If you're looking for ways to make sure that your project is a success, consider incorporating advanced planning and scheduling methods into your project [[strategy]]. | ||
==Tools Necessary for Advanced Planning and Scheduling== | ==Tools Necessary for Advanced Planning and Scheduling== | ||
Line 57: | Line 57: | ||
Project managers face a variety of challenges when trying to ensure the successful completion of any project. One of the most effective ways to overcome these challenges is by utilizing advanced planning and scheduling (APS). | Project managers face a variety of challenges when trying to ensure the successful completion of any project. One of the most effective ways to overcome these challenges is by utilizing advanced planning and scheduling (APS). | ||
Advanced planning and scheduling is a process used to plan and manage complex projects by using a combination of tools, techniques, and resources. It allows project managers to better understand the goals and timeliness of their projects, as well as improve communication and collaboration between team members. | Advanced planning and scheduling is a process used to plan and manage complex projects by using a combination of tools, techniques, and resources. It allows project managers to better understand the goals and timeliness of their projects, as well as improve [[communication and collaboration]] between team members. | ||
When utilizing advanced planning and scheduling, there are several steps that project managers should take. First, they should determine their '''project goals and objectives'''. This will help to ensure that the project is properly planned and managed in the most efficient way possible. Next, they should '''identify the resources needed''' to complete the project, and then create a timeline for the project’s completion. Finally, project managers should '''create a plan''' for monitoring and evaluating progress throughout the project. | When utilizing advanced planning and scheduling, there are several steps that project managers should take. First, they should determine their '''project [[goals and objectives]]'''. This will help to ensure that the project is properly planned and managed in the most efficient way possible. Next, they should '''identify the resources needed''' to complete the project, and then create a timeline for the project’s completion. Finally, project managers should '''create a plan''' for monitoring and evaluating progress throughout the project. | ||
There are a variety of tools and resources that can be used to achieve advanced planning and scheduling. Project management software, such as '''Microsoft Project or Trello''', can help project managers to create and monitor project plans and timeliness. Other resources, such as Gantt charts, can be used to help visualize the timeline and progress of the project. | There are a variety of tools and resources that can be used to achieve advanced planning and scheduling. Project management software, such as '''Microsoft Project or Trello''', can help project managers to create and monitor project plans and timeliness. Other resources, such as Gantt charts, can be used to help visualize the timeline and [[progress of the project]]. | ||
Advanced planning and scheduling can provide a variety of benefits for project managers and their teams. It can help to improve communication and collaboration between team members, as well as provide a better understanding of the project’s goals and timeline. It can also help to increase productivity, as it allows project managers to better plan and manage their projects. | Advanced planning and scheduling can provide a variety of benefits for project managers and their teams. It can help to improve communication and collaboration between team members, as well as provide a better understanding of the project’s goals and timeline. It can also help to increase productivity, as it allows project managers to better plan and manage their projects. | ||
Line 67: | Line 67: | ||
When it comes to best practices for advanced planning and scheduling, it is important to remember to stay organized and focused on the project’s goals. Project managers should also ensure that their teams have a '''clear understanding of the project’s timeline and objectives''', as well as provide regular feedback to ensure that the project is on track. | When it comes to best practices for advanced planning and scheduling, it is important to remember to stay organized and focused on the project’s goals. Project managers should also ensure that their teams have a '''clear understanding of the project’s timeline and objectives''', as well as provide regular feedback to ensure that the project is on track. | ||
Advanced planning and scheduling can be extremely effective in helping project managers to manage complex projects. To demonstrate this, let’s look at a few case studies. For example, a case study conducted by the University of North Carolina found that advanced planning and scheduling '''was able to reduce the time and cost of a project by 20%'''. Similarly, a project management firm in the UK was able to '''reduce project completion time by 25%''' by utilizing the process. | Advanced planning and scheduling can be extremely effective in helping project managers to manage complex projects. To demonstrate this, let’s look at a few case studies. For example, a case study conducted by the University of North Carolina found that advanced planning and scheduling '''was able to reduce the time and cost of a project by 20%'''. Similarly, a project management [[firm]] in the UK was able to '''reduce project completion time by 25%''' by utilizing the process. | ||
Overall, advanced planning and scheduling can be an invaluable tool for project managers. By utilizing the steps outlined above, as well as the tools and resources available, project managers can better plan and manage their projects, while also improving communication and collaboration between team members. It is an effective way to ensure that projects are completed on time and on budget. | Overall, advanced planning and scheduling can be an invaluable tool for project managers. By utilizing the steps outlined above, as well as the tools and resources available, project managers can better plan and manage their projects, while also improving communication and collaboration between team members. It is an effective way to ensure that projects are completed on time and on budget. | ||
==Common Mistakes to Avoid while Implementing Advanced Planning and Scheduling== | ==Common Mistakes to Avoid while Implementing Advanced Planning and Scheduling== | ||
Creating a project schedule is a crucial step for any project, but there are a number of common mistakes that can lead to delays, budget overages, and other issues. To help ensure your project runs smoothly, here are six common mistakes to avoid when creating a project schedule. | Creating a [[project schedule]] is a crucial step for any project, but there are a number of common mistakes that can lead to delays, budget overages, and other issues. To help ensure your project runs smoothly, here are six common mistakes to avoid when creating a project schedule. | ||
* First, not allowing enough time for planning. Many project managers underestimate the amount of time needed to plan their project. It’s important to take the time to consider all the tasks needed to complete the project and how they are related. This will help to ensure that the project stays on schedule. | * First, not allowing enough time for planning. Many project managers underestimate the amount of time needed to plan their project. It’s important to take the time to consider all the tasks needed to complete the project and how they are related. This will help to ensure that the project stays on schedule. | ||
Line 78: | Line 78: | ||
* Third, not considering resource availability. Resources such as personnel, equipment, and materials must be taken into account when creating the project schedule. It’s important to ensure that all necessary resources are available when needed. | * Third, not considering resource availability. Resources such as personnel, equipment, and materials must be taken into account when creating the project schedule. It’s important to ensure that all necessary resources are available when needed. | ||
* Fourth, not considering risks. It’s important to include an analysis of potential risks and how to mitigate them in the project plan. This will help to ensure that the project stays on track and any potential problems are addressed quickly. | * Fourth, not considering risks. It’s important to include an analysis of potential risks and how to mitigate them in the project plan. This will help to ensure that the project stays on track and any potential problems are addressed quickly. | ||
* Fifth, not making use of available technology. Many advanced tools are available to help automate the scheduling process. Taking advantage of these tools can help make the project more efficient and help save time. | * Fifth, not making use of available [[technology]]. Many advanced tools are available to help automate the scheduling process. Taking advantage of these tools can help make the project more efficient and help save time. | ||
* Finally, not communicating effectively. It’s important to keep everyone involved in the project informed of any changes to the schedule or any other factors that may affect the project. This will help to ensure that everyone is working towards the same goals. | * Finally, not communicating effectively. It’s important to keep everyone involved in the project informed of any changes to the schedule or any other factors that may affect the project. This will help to ensure that everyone is working towards the same goals. | ||
Line 84: | Line 84: | ||
==Comparisons of Advanced Planning and Scheduling to Other Approaches== | ==Comparisons of Advanced Planning and Scheduling to Other Approaches== | ||
Are you managing a complex project that requires multiple resources and dependencies? If so, advanced planning and scheduling (APS) may be the solution for you! APS is a more comprehensive and holistic approach to project scheduling than traditional methods, such as critical path method (CPM), Gantt charts, and resource-leveling. | Are you managing a complex project that requires multiple resources and dependencies? If so, advanced planning and scheduling (APS) may be the solution for you! APS is a more comprehensive and holistic approach to project scheduling than traditional methods, such as [[critical path method]] (CPM), Gantt charts, and resource-leveling. | ||
APS takes into account multiple resources, dependencies, budget, and risk to provide a more accurate project schedule. It is also more flexible than traditional methods, as it allows for changes to be made to the schedule without starting over. Additionally, it is better able to handle resource constraints and to identify risks and plan for contingencies. | APS takes into account multiple resources, dependencies, budget, and risk to provide a more accurate project schedule. It is also more flexible than traditional methods, as it allows for changes to be made to the schedule without starting over. Additionally, it is better able to handle resource constraints and to identify risks and plan for contingencies. | ||
Line 90: | Line 90: | ||
The more comprehensive approach of APS is also more accurate than traditional methods, as it takes into account more variables, and can provide more accurate estimates of project duration. However, the downside is that it is more time-consuming, as it requires more detailed analysis and planning. | The more comprehensive approach of APS is also more accurate than traditional methods, as it takes into account more variables, and can provide more accurate estimates of project duration. However, the downside is that it is more time-consuming, as it requires more detailed analysis and planning. | ||
If you are managing a complex project and need more accuracy, flexibility, and risk management, then APS may be the right choice for you. It is a great way to ensure success and make sure your project is completed on time and on budget. | If you are managing a complex project and need more accuracy, flexibility, and [[risk management]], then APS may be the right choice for you. It is a great way to ensure success and make sure your project is completed on time and on budget. | ||
==Suggested literature== | ==Suggested literature== |
Revision as of 13:02, 12 March 2023
Advanced planning and scheduling |
---|
See also |
Advanced Planning and Scheduling (APS) is based on the principles of production planning and control and helps companies increase their production speed and accuracy. It can be used in projects with complex requirements, such as those with multiple processes, multiple resources, and multiple constraints. APS helps to identify and resolve any potential scheduling conflicts and ensure that the project is completed on time and on budget.
Using APS, companies can make better decisions about resource allocation and prioritize tasks more effectively. By optimizing resources and minimizing delays in production, companies can reduce wasted time, money, and effort. In addition, APS can help organizations better understand the potential risks of their production process and plan accordingly.
If you’re looking to improve the efficiency of your production process, Advanced Planning and Scheduling is a great option. It can help you save time, money, and effort, while also ensuring that your project is completed on time and within budget. Try it today and see the results for yourself!
Industry-specific Examples of Advanced Planning and Scheduling
Advanced planning and scheduling is becoming increasingly important in today’s business world. It can make the difference between success and failure in a variety of industries, from construction and manufacturing to IT and healthcare.
In the construction industry, advanced scheduling techniques involve breaking down projects into smaller components, managing resources, and optimizing resource utilization. Planning software can help with this process, making it easier and faster to get the job done. In the manufacturing sector, advanced planning and scheduling includes forecasting and inventory management systems, as well as the integration of supply chain planning with production scheduling.
In the IT industry, advanced planning and scheduling involves the use of project management tools such as Gantt charts, PERT diagrams, Critical Path Method (CPM), and Earned Value Management (EVM) to plan and track projects. For healthcare, advanced planning and scheduling involves the use of scheduling software to automate appointment scheduling, as well as the use of predictive analytics to forecast patient demand. And in the education sector, advanced scheduling techniques involve the use of scheduling tools to assign classes and teachers to students, as well as the use of predictive analytics to forecast student enrollment.
Advanced planning and scheduling is an essential part of running a successful business. It’s not just about getting the job done faster; it’s about getting the job done more efficiently and effectively. With the right tools and techniques, any business can make the most of their resources and maximize their success.
Benefits of Implementing Advanced Planning and Scheduling
Advanced planning and scheduling methods can be a great way to do just that. It can help reduce costs, improve communication, reduce the risk of delays, and even improve customer satisfaction. Let's take a look at how advanced planning and scheduling can make a difference.
Advanced planning and scheduling can provide better visibility into the progress of your project, as well as potential risks. This can help you make more efficient use of your resources and plan ahead for potential problems. Additionally, it can provide a clearer view of the project timeline, which can help improve communication between project members and stakeholders.
Having visibility into the project timeline can also help reduce the risk of delays or cost overruns. Advanced planning and scheduling can identify potential issues early on, giving you more time to address them. This can help keep your project on track and within budget.
Finally, advanced planning and scheduling can help improve the overall quality of your project. It can help you identify areas that need improvement and make sure that your project is completed on time and within budget. This can help ensure customer satisfaction and make sure that your project is a success.
Advanced planning and scheduling can be a great way to improve the success rate of your projects. It can help you reduce costs, improve communication, reduce the risk of delays, and even improve customer satisfaction. If you're looking for ways to make sure that your project is a success, consider incorporating advanced planning and scheduling methods into your project strategy.
Tools Necessary for Advanced Planning and Scheduling
Project planning and scheduling is one of the most important aspects of any successful project. Without proper planning and scheduling, it can be difficult to know when tasks are due, which resources are needed, and when deadlines are approaching. Fortunately, there is a variety of project planning and scheduling software available that can help project managers create detailed plans and schedules for their projects.
One such tool is the Gantt chart. A Gantt chart is a visual representation of a project’s timeline and activities, providing project managers with a clear view of when tasks are due and which resources are needed. It also helps identify when deadlines are approaching and which tasks need to be completed first.
Another tool for project planning and scheduling is the Critical Path Method (CPM). This technique is used to analyze project schedules and identify the most efficient way of completing the project. CPM helps identify the tasks that will take the longest to complete and which ones must be completed first.
Project management software is another great tool for project planning and scheduling. This type of software can help project managers stay organized and on top of all of their tasks. It can help with scheduling, task tracking, resource management, and budgeting.
Calendars can also be a great way to keep track of deadlines and other important dates. They can also be used to plan out tasks and projects in advance. This can be especially helpful when it comes to milestone tracking, which involves setting specific goals and tracking progress towards those goals. Project managers can use milestone tracking to stay focused on the most important tasks and ensure that they are completed on time.
Project planning and scheduling is a critical part of any successful project. With the right tools, project managers can easily create detailed plans and schedules, track progress, analyze resources, and create reports. With these tools, project managers can stay organized and on top of all tasks, ensuring that projects are completed on time and within budget.
Step-by-Step Guide to Advanced Planning and Scheduling
Project managers face a variety of challenges when trying to ensure the successful completion of any project. One of the most effective ways to overcome these challenges is by utilizing advanced planning and scheduling (APS).
Advanced planning and scheduling is a process used to plan and manage complex projects by using a combination of tools, techniques, and resources. It allows project managers to better understand the goals and timeliness of their projects, as well as improve communication and collaboration between team members.
When utilizing advanced planning and scheduling, there are several steps that project managers should take. First, they should determine their project goals and objectives. This will help to ensure that the project is properly planned and managed in the most efficient way possible. Next, they should identify the resources needed to complete the project, and then create a timeline for the project’s completion. Finally, project managers should create a plan for monitoring and evaluating progress throughout the project.
There are a variety of tools and resources that can be used to achieve advanced planning and scheduling. Project management software, such as Microsoft Project or Trello, can help project managers to create and monitor project plans and timeliness. Other resources, such as Gantt charts, can be used to help visualize the timeline and progress of the project.
Advanced planning and scheduling can provide a variety of benefits for project managers and their teams. It can help to improve communication and collaboration between team members, as well as provide a better understanding of the project’s goals and timeline. It can also help to increase productivity, as it allows project managers to better plan and manage their projects.
When it comes to best practices for advanced planning and scheduling, it is important to remember to stay organized and focused on the project’s goals. Project managers should also ensure that their teams have a clear understanding of the project’s timeline and objectives, as well as provide regular feedback to ensure that the project is on track.
Advanced planning and scheduling can be extremely effective in helping project managers to manage complex projects. To demonstrate this, let’s look at a few case studies. For example, a case study conducted by the University of North Carolina found that advanced planning and scheduling was able to reduce the time and cost of a project by 20%. Similarly, a project management firm in the UK was able to reduce project completion time by 25% by utilizing the process.
Overall, advanced planning and scheduling can be an invaluable tool for project managers. By utilizing the steps outlined above, as well as the tools and resources available, project managers can better plan and manage their projects, while also improving communication and collaboration between team members. It is an effective way to ensure that projects are completed on time and on budget.
Common Mistakes to Avoid while Implementing Advanced Planning and Scheduling
Creating a project schedule is a crucial step for any project, but there are a number of common mistakes that can lead to delays, budget overages, and other issues. To help ensure your project runs smoothly, here are six common mistakes to avoid when creating a project schedule.
- First, not allowing enough time for planning. Many project managers underestimate the amount of time needed to plan their project. It’s important to take the time to consider all the tasks needed to complete the project and how they are related. This will help to ensure that the project stays on schedule.
- Second, not considering dependencies. In addition to considering all the tasks needed to complete the project, it’s important to think about the order in which they will be completed. Many tasks are dependent on the completion of others, and it’s important to account for these dependencies when scheduling the project.
- Third, not considering resource availability. Resources such as personnel, equipment, and materials must be taken into account when creating the project schedule. It’s important to ensure that all necessary resources are available when needed.
- Fourth, not considering risks. It’s important to include an analysis of potential risks and how to mitigate them in the project plan. This will help to ensure that the project stays on track and any potential problems are addressed quickly.
- Fifth, not making use of available technology. Many advanced tools are available to help automate the scheduling process. Taking advantage of these tools can help make the project more efficient and help save time.
- Finally, not communicating effectively. It’s important to keep everyone involved in the project informed of any changes to the schedule or any other factors that may affect the project. This will help to ensure that everyone is working towards the same goals.
Creating a project schedule is an important step for any project, and it’s important to take the time to do it right. By avoiding these common mistakes, you can help to ensure that your project runs smoothly and is completed on time and on budget.
Comparisons of Advanced Planning and Scheduling to Other Approaches
Are you managing a complex project that requires multiple resources and dependencies? If so, advanced planning and scheduling (APS) may be the solution for you! APS is a more comprehensive and holistic approach to project scheduling than traditional methods, such as critical path method (CPM), Gantt charts, and resource-leveling.
APS takes into account multiple resources, dependencies, budget, and risk to provide a more accurate project schedule. It is also more flexible than traditional methods, as it allows for changes to be made to the schedule without starting over. Additionally, it is better able to handle resource constraints and to identify risks and plan for contingencies.
The more comprehensive approach of APS is also more accurate than traditional methods, as it takes into account more variables, and can provide more accurate estimates of project duration. However, the downside is that it is more time-consuming, as it requires more detailed analysis and planning.
If you are managing a complex project and need more accuracy, flexibility, and risk management, then APS may be the right choice for you. It is a great way to ensure success and make sure your project is completed on time and on budget.
Suggested literature
- Hvolby, H. H., & Steger-Jensen, K. (2010). Technical and industrial issues of Advanced Planning and Scheduling (aps) systems. Computers in Industry, 61(9), 845-851.
- Lee, Y. H., Jeong, C. S., & Moon, C. (2002). Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers & Industrial Engineering, 43(1-2), 351-374.
- Steger-Jensen, K., Hvolby, H. H., Nielsen, P., & Nielsen, I. (2011). Advanced planning and scheduling technology. Production Planning & Control, 22(8), 800-808.